The VM and host networking components failed to negotiate protocol version '6.0'

I have recently created one Windows Server 2019 VM at Hyper V 2012 R2 host. I see below events always. How could I fix it?

EventID 2: The VM and host networking components failed to negotiate protocol version '6.0'
EventID 2: The VM and host networking components failed to negotiate protocol version '6.1'

windows-serverwindows-server-2019windows-server-hyper-vwindows-server-2012
5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

XiaoweiHe-MSFT avatar image
0 Votes"
XiaoweiHe-MSFT answered

Hi,

As far as I'm concerned, the error message may due to the Windows Server 2019 VM version is too higher for the Windows 2012R2 host. Server 2012 R2 has no knowledge of Server 2019, nor the version of the Integration Components that it would have.

It's recommended to upgrade the Hyper V host System version, so they can have better compatibility.

Thanks for your time!
Best Regards,
Anne


If the Answer is helpful, please click "Accept Answer" and upvote it.
Note: Please follow the steps in our documentation to enable e-mail notifications if you want to receive the related email notification for this thread.

5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

MohdArif-3014 avatar image
0 Votes"
MohdArif-3014 answered XiaoweiHe-MSFT commented

I suspect same thing what you said. I verified some other server 2019 and 2016 which is running at different-different Hyper v 2012 R2 host and I observed same events there too. Since those VMs are running fine since years so I think I can ignore it. thanks for your help

· 1
5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

Yes, if they do not affect your management, it's OK to ignore them.

You are welcome! :)

0 Votes 0 ·