question

skdev avatar image
0 Votes"
skdev asked DhananjayaMata-9965 commented

Data Factory Azure hosted integration runtime managed Vnet stays in Running (Limited) status after creation


Hi there,
I have created data factory with Azure hosted integration runtime with managed virtual network. But after creation, the status of the integration runtime stays in 'Running (Limited', with the below message:
Data movement, interactive query, pipeline and external activities: Failed
Dataflow: Succeeded
IRs can take 15 minutes to be ready for dataflow from the time they are created

Location: North Europe.

Could you please help on what could be wrong here?

azure-data-factory
5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

1 Answer

skdev avatar image
0 Votes"
skdev answered DhananjayaMata-9965 commented

This got fixed next day, after doing 'Repair' manually from the data factory portal. Not sure if there was some underlying issue with data factory at that point. Thanks.

· 3
5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

Hello @SanalKumarP-5748,

Glad to know that your issue has resolved. You can accept it as answer. And thanks for sharing the solution, which might be beneficial to other community members reading this thread. Thank you.

Regarding the issue, we have raised a request to our Product team to looking in the issue. We will update once we have update from our Product team.

Thank you for your patience.

1 Vote 1 ·

Hello @SanalKumarP-5748,

We have received update from our Product team and below is the update.

We had identified that the job creating the VNet in the backend has missed some properties, which has caused the issue.

Where we had created a work item for the issue and will be going to deploy a fix, to address the issue.

Hope this helps.

0 Votes 0 ·

hello @PRADEEPCHEEKATLA-MSFT ,
I have similar problem and the repair option has not fixed my issue .
Location is Australia East .
Are you able to assist .

Error message:
Data movement, interactive query, pipeline and external activities: Succeeded
Dataflow: Failed
IRs can take 15 minutes to be ready for dataflow from the time they are created.

0 Votes 0 ·