Expedite work with swimlanes
Azure Boards | Azure DevOps Server 2019 | TFS 2018 | TFS 2017 | TFS 2015
Your Kanban board supports your ability to visualize the flow of work as it moves from new to done. When you add swimlanes, you can also visualize the status of work that supports different service-level classes. You can create a swimlane to represent any other dimension that supports your tracking needs.
For example, you can create three swimlanes—Expedite, Standard, and Parked—to track high-priority work, standard work, and work that's currently blocked.
Tip
Type o to expand all swimlanes and u to collapse all swimlanes. To move the focus up or down, enter the up/down arrows. For more tips, see kanban board keyboard shortcuts.
Prerequisites
- You must be added to the team administrator role for the team's settings you want to modify, or be a member of the Project Administrators security group. To get added, see Add a team administrator or Set permissions at the project- or collection-level.
- You must be granted Stakeholder access or higher. For details, see About access levels.
Types of swimlanes
You can use swimlanes to sort work on your Kanban board to track items that you differentiate as follows:
- High priority items
- Service-level class
- Date-driven requirement
- Dependency for or from another team
- Blocked items
- Technical debt or other engineering work that's not a specific user story
Track work in swimlanes
Once you've set up your swimlanes, you can drag items into a swimlane as well as reorder them within the lane.
You can also focus on a single swimlane by collapsing all other lanes.
Configure swimlanes
So, what swimlanes will support your tracking needs?
Once you've identified one or two, add them to your Kanban board.
Open your Kanban board. If you're not a team admin, get added as one. Only team and project admins can customize the Kanban board.
Choose the
gear icon to configure the board and set general team settings.
Choose Swimlanes and then choose the
plus icon and enter the name of the swimlane you want to add.
The default lane appears unlabeled on the Kanban board. You can rename it to anything you like, however, you can't delete it. Also, you can rename it directly from the Kanban board.
To reorder your swimlanes, simply grab the lane and move it up or down.
If you need to delete a swimlane, first move all items out of the lane. Then open the Settings dialog, choose the
actions icon and select Remove.
When done with your changes, choose Save.
Open your Kanban board. If you're not a team admin, get added as one. Only team and project admins can customize the Kanban board.
Choose the
gear icon to open the common configuration settings dialog for the Kanban board.
Choose Swimlanes and then choose the
plus icon and enter the name of the swimlane you want to add.
The default lane appears unlabeled on the Kanban board. You can rename it to anything you like, however, you can't delete it. Also, you can rename it directly from the Kanban board.
To reorder your swimlanes, simply grab the lane and move it up or down.
If you need to delete a swimlane, first move all items out of the lane. Then open the Settings dialog, choose the
actions icon and select Remove.
When done with your changes, choose Save.
Open your Kanban board. If you're not a team admin, get added as one. Only team and project admins can customize the Kanban board.
Choose the
gear icon to open the common configuration settings dialog for the Kanban board.
Choose Swimlanes, and then choose the
plus icon, and enter the name of the swimlane you want to add.
For TFS 2015.1 and later versions
The default lane appears unlabeled on the Kanban board. You can rename it to anything you like, however, you can't delete it. Also, you can rename it directly from the Kanban board.For TFS 2015
The default lane is automatically renamed to Standard when you add a second lane. You can rename it to anything you like, however, you can't delete it.To reorder your swimlanes, simply grab the lane and move it up or down.
If you need to delete a lane, first move all items out of the lane. Then, choose the
actions icon and select Delete.
When done with your changes, choose Save.
Track lane moves
You can track Kanban board swimlane moves by creating a query and using the Board Lane field.
Track lane moves
For TFS 2015.1 and later versions
You can track Kanban board swimlane moves by creating a query and using the Board Lane field.
For TFS 2015
Similar to the way column moves are tracked, swimlane moves are captured in the history field.
For TFS 2015 and earlier versions, you can't query for all items in a particular swimlane. To perform such a query, you'd have to assign a value to a field, such as the Priority field, or tag each item in a similar way.
Related articles
As you can see, swimlanes provides another way to organize and visualize the flow of work using Kanban. Here are a few more options you have for customizing the look and feel of your Kanban board.
REST API resources
To programmatically interact with the Kanban board and other team settings, see the REST API, Boards reference.
Feedback
We'd love to hear your thoughts. Choose the type you'd like to provide:
Our feedback system is built on GitHub Issues. Read more on our blog.
Loading feedback...