PjPERTField Enum
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public enum class PjPERTField
[System.Runtime.InteropServices.Guid("9B54B7B0-922A-11CF-982C-00AA00322803")]
public enum PjPERTField
Public Enum PjPERTField
- Inheritance
-
PjPERTField
- Attributes
Fields
| pjPERTTaskActive | 188744959 | |
| pjPERTTaskActualCost | 188743687 | |
| pjPERTTaskActualDuration | 188743708 | |
| pjPERTTaskActualFinish | 188743722 | |
| pjPERTTaskActualOvertimeCost | 188743849 | |
| pjPERTTaskActualOvertimeWork | 188743844 | |
| pjPERTTaskActualOvertimeWorkProtected | 188744820 | |
| pjPERTTaskActualStart | 188743721 | |
| pjPERTTaskActualWork | 188743682 | |
| pjPERTTaskActualWorkProtected | 188744819 | |
| pjPERTTaskACWP | 188743800 | |
| pjPERTTaskAssignment_Owner | 188744850 | |
| pjPERTTaskAssignmentDelay | 188744046 | |
| pjPERTTaskAssignmentPeakUnits | 188745015 | |
| pjPERTTaskAssignmentUnits | 188744047 | |
| pjPERTTaskBaseline10BudgetCost | 188744927 | |
| pjPERTTaskBaseline10BudgetWork | 188744926 | |
| pjPERTTaskBaseline10Cost | 188744270 | |
| pjPERTTaskBaseline10DeliverableFinish | 188744925 | |
| pjPERTTaskBaseline10DeliverableStart | 188744924 | |
| pjPERTTaskBaseline10Duration | 188744273 | |
| pjPERTTaskBaseline10DurationText | 188745011 | |
| pjPERTTaskBaseline10Finish | 188744269 | |
| pjPERTTaskBaseline10FinishText | 188745010 | |
| pjPERTTaskBaseline10FixedCost | 188744275 | |
| pjPERTTaskBaseline10FixedCostAccrual | 188744923 | |
| pjPERTTaskBaseline10Start | 188744268 | |
| pjPERTTaskBaseline10StartText | 188745009 | |
| pjPERTTaskBaseline10Work | 188744271 | |
| pjPERTTaskBaseline1BudgetCost | 188744864 | |
| pjPERTTaskBaseline1BudgetWork | 188744863 | |
| pjPERTTaskBaseline1Cost | 188744164 | |
| pjPERTTaskBaseline1DeliverableFinish | 188744862 | |
| pjPERTTaskBaseline1DeliverableStart | 188744861 | |
| pjPERTTaskBaseline1Duration | 188744167 | |
| pjPERTTaskBaseline1DurationText | 188744984 | |
| pjPERTTaskBaseline1Finish | 188744163 | |
| pjPERTTaskBaseline1FinishText | 188744983 | |
| pjPERTTaskBaseline1FixedCost | 188744169 | |
| pjPERTTaskBaseline1FixedCostAccrual | 188744860 | |
| pjPERTTaskBaseline1Start | 188744162 | |
| pjPERTTaskBaseline1StartText | 188744982 | |
| pjPERTTaskBaseline1Work | 188744165 | |
| pjPERTTaskBaseline2BudgetCost | 188744871 | |
| pjPERTTaskBaseline2BudgetWork | 188744870 | |
| pjPERTTaskBaseline2Cost | 188744175 | |
| pjPERTTaskBaseline2DeliverableFinish | 188744869 | |
| pjPERTTaskBaseline2DeliverableStart | 188744868 | |
| pjPERTTaskBaseline2Duration | 188744178 | |
| pjPERTTaskBaseline2DurationText | 188744987 | |
| pjPERTTaskBaseline2Finish | 188744174 | |
| pjPERTTaskBaseline2FinishText | 188744986 | |
| pjPERTTaskBaseline2FixedCost | 188744180 | |
| pjPERTTaskBaseline2FixedCostAccrual | 188744867 | |
| pjPERTTaskBaseline2Start | 188744173 | |
| pjPERTTaskBaseline2StartText | 188744985 | |
| pjPERTTaskBaseline2Work | 188744176 | |
| pjPERTTaskBaseline3BudgetCost | 188744878 | |
| pjPERTTaskBaseline3BudgetWork | 188744877 | |
| pjPERTTaskBaseline3Cost | 188744186 | |
| pjPERTTaskBaseline3DeliverableFinish | 188744876 | |
| pjPERTTaskBaseline3DeliverableStart | 188744875 | |
| pjPERTTaskBaseline3Duration | 188744189 | |
| pjPERTTaskBaseline3DurationText | 188744990 | |
| pjPERTTaskBaseline3Finish | 188744185 | |
| pjPERTTaskBaseline3FinishText | 188744989 | |
| pjPERTTaskBaseline3FixedCost | 188744191 | |
| pjPERTTaskBaseline3FixedCostAccrual | 188744874 | |
| pjPERTTaskBaseline3Start | 188744184 | |
| pjPERTTaskBaseline3StartText | 188744988 | |
| pjPERTTaskBaseline3Work | 188744187 | |
| pjPERTTaskBaseline4BudgetCost | 188744885 | |
| pjPERTTaskBaseline4BudgetWork | 188744884 | |
| pjPERTTaskBaseline4Cost | 188744197 | |
| pjPERTTaskBaseline4DeliverableFinish | 188744883 | |
| pjPERTTaskBaseline4DeliverableStart | 188744882 | |
| pjPERTTaskBaseline4Duration | 188744200 | |
| pjPERTTaskBaseline4DurationText | 188744993 | |
| pjPERTTaskBaseline4Finish | 188744196 | |
| pjPERTTaskBaseline4FinishText | 188744992 | |
| pjPERTTaskBaseline4FixedCost | 188744202 | |
| pjPERTTaskBaseline4FixedCostAccrual | 188744881 | |
| pjPERTTaskBaseline4Start | 188744195 | |
| pjPERTTaskBaseline4StartText | 188744991 | |
| pjPERTTaskBaseline4Work | 188744198 | |
| pjPERTTaskBaseline5BudgetCost | 188744892 | |
| pjPERTTaskBaseline5BudgetWork | 188744891 | |
| pjPERTTaskBaseline5Cost | 188744208 | |
| pjPERTTaskBaseline5DeliverableFinish | 188744890 | |
| pjPERTTaskBaseline5DeliverableStart | 188744889 | |
| pjPERTTaskBaseline5Duration | 188744211 | |
| pjPERTTaskBaseline5DurationText | 188744996 | |
| pjPERTTaskBaseline5Finish | 188744207 | |
| pjPERTTaskBaseline5FinishText | 188744995 | |
| pjPERTTaskBaseline5FixedCost | 188744213 | |
| pjPERTTaskBaseline5FixedCostAccrual | 188744888 | |
| pjPERTTaskBaseline5Start | 188744206 | |
| pjPERTTaskBaseline5StartText | 188744994 | |
| pjPERTTaskBaseline5Work | 188744209 | |
| pjPERTTaskBaseline6BudgetCost | 188744899 | |
| pjPERTTaskBaseline6BudgetWork | 188744898 | |
| pjPERTTaskBaseline6Cost | 188744226 | |
| pjPERTTaskBaseline6DeliverableFinish | 188744897 | |
| pjPERTTaskBaseline6DeliverableStart | 188744896 | |
| pjPERTTaskBaseline6Duration | 188744229 | |
| pjPERTTaskBaseline6DurationText | 188744999 | |
| pjPERTTaskBaseline6Finish | 188744225 | |
| pjPERTTaskBaseline6FinishText | 188744998 | |
| pjPERTTaskBaseline6FixedCost | 188744231 | |
| pjPERTTaskBaseline6FixedCostAccrual | 188744895 | |
| pjPERTTaskBaseline6Start | 188744224 | |
| pjPERTTaskBaseline6StartText | 188744997 | |
| pjPERTTaskBaseline6Work | 188744227 | |
| pjPERTTaskBaseline7BudgetCost | 188744906 | |
| pjPERTTaskBaseline7BudgetWork | 188744905 | |
| pjPERTTaskBaseline7Cost | 188744237 | |
| pjPERTTaskBaseline7DeliverableFinish | 188744904 | |
| pjPERTTaskBaseline7DeliverableStart | 188744903 | |
| pjPERTTaskBaseline7Duration | 188744240 | |
| pjPERTTaskBaseline7DurationText | 188745002 | |
| pjPERTTaskBaseline7Finish | 188744236 | |
| pjPERTTaskBaseline7FinishText | 188745001 | |
| pjPERTTaskBaseline7FixedCost | 188744242 | |
| pjPERTTaskBaseline7FixedCostAccrual | 188744902 | |
| pjPERTTaskBaseline7Start | 188744235 | |
| pjPERTTaskBaseline7StartText | 188745000 | |
| pjPERTTaskBaseline7Work | 188744238 | |
| pjPERTTaskBaseline8BudgetCost | 188744913 | |
| pjPERTTaskBaseline8BudgetWork | 188744912 | |
| pjPERTTaskBaseline8Cost | 188744248 | |
| pjPERTTaskBaseline8DeliverableFinish | 188744911 | |
| pjPERTTaskBaseline8DeliverableStart | 188744910 | |
| pjPERTTaskBaseline8Duration | 188744251 | |
| pjPERTTaskBaseline8DurationText | 188745005 | |
| pjPERTTaskBaseline8Finish | 188744247 | |
| pjPERTTaskBaseline8FinishText | 188745004 | |
| pjPERTTaskBaseline8FixedCost | 188744253 | |
| pjPERTTaskBaseline8FixedCostAccrual | 188744909 | |
| pjPERTTaskBaseline8Start | 188744246 | |
| pjPERTTaskBaseline8StartText | 188745003 | |
| pjPERTTaskBaseline8Work | 188744249 | |
| pjPERTTaskBaseline9BudgetCost | 188744920 | |
| pjPERTTaskBaseline9BudgetWork | 188744919 | |
| pjPERTTaskBaseline9Cost | 188744259 | |
| pjPERTTaskBaseline9DeliverableFinish | 188744918 | |
| pjPERTTaskBaseline9DeliverableStart | 188744917 | |
| pjPERTTaskBaseline9Duration | 188744262 | |
| pjPERTTaskBaseline9DurationText | 188745008 | |
| pjPERTTaskBaseline9Finish | 188744258 | |
| pjPERTTaskBaseline9FinishText | 188745007 | |
| pjPERTTaskBaseline9FixedCost | 188744264 | |
| pjPERTTaskBaseline9FixedCostAccrual | 188744916 | |
| pjPERTTaskBaseline9Start | 188744257 | |
| pjPERTTaskBaseline9StartText | 188745006 | |
| pjPERTTaskBaseline9Work | 188744260 | |
| pjPERTTaskBaselineBudgetCost | 188744857 | |
| pjPERTTaskBaselineBudgetWork | 188744856 | |
| pjPERTTaskBaselineCost | 188743686 | |
| pjPERTTaskBaselineDeliverableFinish | 188744855 | |
| pjPERTTaskBaselineDeliverableStart | 188744854 | |
| pjPERTTaskBaselineDuration | 188743707 | |
| pjPERTTaskBaselineDurationText | 188744981 | |
| pjPERTTaskBaselineFinish | 188743724 | |
| pjPERTTaskBaselineFinishText | 188744980 | |
| pjPERTTaskBaselineFixedCost | 188744160 | |
| pjPERTTaskBaselineFixedCostAccrual | 188744853 | |
| pjPERTTaskBaselineStart | 188743723 | |
| pjPERTTaskBaselineStartText | 188744979 | |
| pjPERTTaskBaselineWork | 188743681 | |
| pjPERTTaskBCWP | 188743691 | |
| pjPERTTaskBCWS | 188743692 | |
| pjPERTTaskBudgetCost | 188744852 | |
| pjPERTTaskBudgetWork | 188744851 | |
| pjPERTTaskCalendar | 188744082 | |
| pjPERTTaskCalendarGuid | 188744824 | |
| pjPERTTaskConfirmed | 188743790 | |
| pjPERTTaskConstraintDate | 188743698 | |
| pjPERTTaskConstraintType | 188743697 | |
| pjPERTTaskContact | 188743792 | |
| pjPERTTaskCost | 188743685 | |
| pjPERTTaskCost1 | 188743786 | |
| pjPERTTaskCost10 | 188743944 | |
| pjPERTTaskCost2 | 188743787 | |
| pjPERTTaskCost3 | 188743788 | |
| pjPERTTaskCost4 | 188743938 | |
| pjPERTTaskCost5 | 188743939 | |
| pjPERTTaskCost6 | 188743940 | |
| pjPERTTaskCost7 | 188743941 | |
| pjPERTTaskCost8 | 188743942 | |
| pjPERTTaskCost9 | 188743943 | |
| pjPERTTaskCostRateTable | 188744048 | |
| pjPERTTaskCostVariance | 188743689 | |
| pjPERTTaskCPI | 188744217 | |
| pjPERTTaskCreated | 188743773 | |
| pjPERTTaskCritical | 188743699 | |
| pjPERTTaskCV | 188743763 | |
| pjPERTTaskCVPercent | 188744219 | |
| pjPERTTaskDate1 | 188743945 | |
| pjPERTTaskDate10 | 188743954 | |
| pjPERTTaskDate2 | 188743946 | |
| pjPERTTaskDate3 | 188743947 | |
| pjPERTTaskDate4 | 188743948 | |
| pjPERTTaskDate5 | 188743949 | |
| pjPERTTaskDate6 | 188743950 | |
| pjPERTTaskDate7 | 188743951 | |
| pjPERTTaskDate8 | 188743952 | |
| pjPERTTaskDate9 | 188743953 | |
| pjPERTTaskDeadline | 188744117 | |
| pjPERTTaskDeliverableFinish | 188744833 | |
| pjPERTTaskDeliverableGuid | 188744826 | |
| pjPERTTaskDeliverableName | 188744956 | |
| pjPERTTaskDeliverableStart | 188744832 | |
| pjPERTTaskDeliverableType | 188744827 | |
| pjPERTTaskDemandedRequested | 188744800 | |
| pjPERTTaskDuration | 188743709 | |
| pjPERTTaskDuration1 | 188743783 | |
| pjPERTTaskDuration10 | 188743961 | |
| pjPERTTaskDuration2 | 188743784 | |
| pjPERTTaskDuration3 | 188743785 | |
| pjPERTTaskDuration4 | 188743955 | |
| pjPERTTaskDuration5 | 188743956 | |
| pjPERTTaskDuration6 | 188743957 | |
| pjPERTTaskDuration7 | 188743958 | |
| pjPERTTaskDuration8 | 188743959 | |
| pjPERTTaskDuration9 | 188743960 | |
| pjPERTTaskDurationText | 188744967 | |
| pjPERTTaskDurationVariance | 188743710 | |
| pjPERTTaskEAC | 188744221 | |
| pjPERTTaskEarlyFinish | 188743718 | |
| pjPERTTaskEarlyStart | 188743717 | |
| pjPERTTaskEarnedValueMethod | 188744802 | |
| pjPERTTaskEffortDriven | 188743812 | |
| pjPERTTaskEnterpriseCost1 | 188744279 | |
| pjPERTTaskEnterpriseCost10 | 188744288 | |
| pjPERTTaskEnterpriseCost2 | 188744280 | |
| pjPERTTaskEnterpriseCost3 | 188744281 | |
| pjPERTTaskEnterpriseCost4 | 188744282 | |
| pjPERTTaskEnterpriseCost5 | 188744283 | |
| pjPERTTaskEnterpriseCost6 | 188744284 | |
| pjPERTTaskEnterpriseCost7 | 188744285 | |
| pjPERTTaskEnterpriseCost8 | 188744286 | |
| pjPERTTaskEnterpriseCost9 | 188744287 | |
| pjPERTTaskEnterpriseDate1 | 188744289 | |
| pjPERTTaskEnterpriseDate10 | 188744298 | |
| pjPERTTaskEnterpriseDate11 | 188744299 | |
| pjPERTTaskEnterpriseDate12 | 188744300 | |
| pjPERTTaskEnterpriseDate13 | 188744301 | |
| pjPERTTaskEnterpriseDate14 | 188744302 | |
| pjPERTTaskEnterpriseDate15 | 188744303 | |
| pjPERTTaskEnterpriseDate16 | 188744304 | |
| pjPERTTaskEnterpriseDate17 | 188744305 | |
| pjPERTTaskEnterpriseDate18 | 188744306 | |
| pjPERTTaskEnterpriseDate19 | 188744307 | |
| pjPERTTaskEnterpriseDate2 | 188744290 | |
| pjPERTTaskEnterpriseDate20 | 188744308 | |
| pjPERTTaskEnterpriseDate21 | 188744309 | |
| pjPERTTaskEnterpriseDate22 | 188744310 | |
| pjPERTTaskEnterpriseDate23 | 188744311 | |
| pjPERTTaskEnterpriseDate24 | 188744312 | |
| pjPERTTaskEnterpriseDate25 | 188744313 | |
| pjPERTTaskEnterpriseDate26 | 188744314 | |
| pjPERTTaskEnterpriseDate27 | 188744315 | |
| pjPERTTaskEnterpriseDate28 | 188744316 | |
| pjPERTTaskEnterpriseDate29 | 188744317 | |
| pjPERTTaskEnterpriseDate3 | 188744291 | |
| pjPERTTaskEnterpriseDate30 | 188744318 | |
| pjPERTTaskEnterpriseDate4 | 188744292 | |
| pjPERTTaskEnterpriseDate5 | 188744293 | |
| pjPERTTaskEnterpriseDate6 | 188744294 | |
| pjPERTTaskEnterpriseDate7 | 188744295 | |
| pjPERTTaskEnterpriseDate8 | 188744296 | |
| pjPERTTaskEnterpriseDate9 | 188744297 | |
| pjPERTTaskEnterpriseDuration1 | 188744319 | |
| pjPERTTaskEnterpriseDuration10 | 188744328 | |
| pjPERTTaskEnterpriseDuration2 | 188744320 | |
| pjPERTTaskEnterpriseDuration3 | 188744321 | |
| pjPERTTaskEnterpriseDuration4 | 188744322 | |
| pjPERTTaskEnterpriseDuration5 | 188744323 | |
| pjPERTTaskEnterpriseDuration6 | 188744324 | |
| pjPERTTaskEnterpriseDuration7 | 188744325 | |
| pjPERTTaskEnterpriseDuration8 | 188744326 | |
| pjPERTTaskEnterpriseDuration9 | 188744327 | |
| pjPERTTaskEnterpriseFlag1 | 188744339 | |
| pjPERTTaskEnterpriseFlag10 | 188744348 | |
| pjPERTTaskEnterpriseFlag11 | 188744349 | |
| pjPERTTaskEnterpriseFlag12 | 188744350 | |
| pjPERTTaskEnterpriseFlag13 | 188744351 | |
| pjPERTTaskEnterpriseFlag14 | 188744352 | |
| pjPERTTaskEnterpriseFlag15 | 188744353 | |
| pjPERTTaskEnterpriseFlag16 | 188744354 | |
| pjPERTTaskEnterpriseFlag17 | 188744355 | |
| pjPERTTaskEnterpriseFlag18 | 188744356 | |
| pjPERTTaskEnterpriseFlag19 | 188744357 | |
| pjPERTTaskEnterpriseFlag2 | 188744340 | |
| pjPERTTaskEnterpriseFlag20 | 188744358 | |
| pjPERTTaskEnterpriseFlag3 | 188744341 | |
| pjPERTTaskEnterpriseFlag4 | 188744342 | |
| pjPERTTaskEnterpriseFlag5 | 188744343 | |
| pjPERTTaskEnterpriseFlag6 | 188744344 | |
| pjPERTTaskEnterpriseFlag7 | 188744345 | |
| pjPERTTaskEnterpriseFlag8 | 188744346 | |
| pjPERTTaskEnterpriseFlag9 | 188744347 | |
| pjPERTTaskEnterpriseNumber1 | 188744379 | |
| pjPERTTaskEnterpriseNumber10 | 188744388 | |
| pjPERTTaskEnterpriseNumber11 | 188744389 | |
| pjPERTTaskEnterpriseNumber12 | 188744390 | |
| pjPERTTaskEnterpriseNumber13 | 188744391 | |
| pjPERTTaskEnterpriseNumber14 | 188744392 | |
| pjPERTTaskEnterpriseNumber15 | 188744393 | |
| pjPERTTaskEnterpriseNumber16 | 188744394 | |
| pjPERTTaskEnterpriseNumber17 | 188744395 | |
| pjPERTTaskEnterpriseNumber18 | 188744396 | |
| pjPERTTaskEnterpriseNumber19 | 188744397 | |
| pjPERTTaskEnterpriseNumber2 | 188744380 | |
| pjPERTTaskEnterpriseNumber20 | 188744398 | |
| pjPERTTaskEnterpriseNumber21 | 188744399 | |
| pjPERTTaskEnterpriseNumber22 | 188744400 | |
| pjPERTTaskEnterpriseNumber23 | 188744401 | |
| pjPERTTaskEnterpriseNumber24 | 188744402 | |
| pjPERTTaskEnterpriseNumber25 | 188744403 | |
| pjPERTTaskEnterpriseNumber26 | 188744404 | |
| pjPERTTaskEnterpriseNumber27 | 188744405 | |
| pjPERTTaskEnterpriseNumber28 | 188744406 | |
| pjPERTTaskEnterpriseNumber29 | 188744407 | |
| pjPERTTaskEnterpriseNumber3 | 188744381 | |
| pjPERTTaskEnterpriseNumber30 | 188744408 | |
| pjPERTTaskEnterpriseNumber31 | 188744409 | |
| pjPERTTaskEnterpriseNumber32 | 188744410 | |
| pjPERTTaskEnterpriseNumber33 | 188744411 | |
| pjPERTTaskEnterpriseNumber34 | 188744412 | |
| pjPERTTaskEnterpriseNumber35 | 188744413 | |
| pjPERTTaskEnterpriseNumber36 | 188744414 | |
| pjPERTTaskEnterpriseNumber37 | 188744415 | |
| pjPERTTaskEnterpriseNumber38 | 188744416 | |
| pjPERTTaskEnterpriseNumber39 | 188744417 | |
| pjPERTTaskEnterpriseNumber4 | 188744382 | |
| pjPERTTaskEnterpriseNumber40 | 188744418 | |
| pjPERTTaskEnterpriseNumber5 | 188744383 | |
| pjPERTTaskEnterpriseNumber6 | 188744384 | |
| pjPERTTaskEnterpriseNumber7 | 188744385 | |
| pjPERTTaskEnterpriseNumber8 | 188744386 | |
| pjPERTTaskEnterpriseNumber9 | 188744387 | |
| pjPERTTaskEnterpriseOutlineCode1 | 188744419 | |
| pjPERTTaskEnterpriseOutlineCode10 | 188744437 | |
| pjPERTTaskEnterpriseOutlineCode11 | 188744439 | |
| pjPERTTaskEnterpriseOutlineCode12 | 188744441 | |
| pjPERTTaskEnterpriseOutlineCode13 | 188744443 | |
| pjPERTTaskEnterpriseOutlineCode14 | 188744445 | |
| pjPERTTaskEnterpriseOutlineCode15 | 188744447 | |
| pjPERTTaskEnterpriseOutlineCode16 | 188744449 | |
| pjPERTTaskEnterpriseOutlineCode17 | 188744451 | |
| pjPERTTaskEnterpriseOutlineCode18 | 188744453 | |
| pjPERTTaskEnterpriseOutlineCode19 | 188744455 | |
| pjPERTTaskEnterpriseOutlineCode2 | 188744421 | |
| pjPERTTaskEnterpriseOutlineCode20 | 188744457 | |
| pjPERTTaskEnterpriseOutlineCode21 | 188744459 | |
| pjPERTTaskEnterpriseOutlineCode22 | 188744461 | |
| pjPERTTaskEnterpriseOutlineCode23 | 188744463 | |
| pjPERTTaskEnterpriseOutlineCode24 | 188744465 | |
| pjPERTTaskEnterpriseOutlineCode25 | 188744467 | |
| pjPERTTaskEnterpriseOutlineCode26 | 188744469 | |
| pjPERTTaskEnterpriseOutlineCode27 | 188744471 | |
| pjPERTTaskEnterpriseOutlineCode28 | 188744473 | |
| pjPERTTaskEnterpriseOutlineCode29 | 188744475 | |
| pjPERTTaskEnterpriseOutlineCode3 | 188744423 | |
| pjPERTTaskEnterpriseOutlineCode30 | 188744477 | |
| pjPERTTaskEnterpriseOutlineCode4 | 188744425 | |
| pjPERTTaskEnterpriseOutlineCode5 | 188744427 | |
| pjPERTTaskEnterpriseOutlineCode6 | 188744429 | |
| pjPERTTaskEnterpriseOutlineCode7 | 188744431 | |
| pjPERTTaskEnterpriseOutlineCode8 | 188744433 | |
| pjPERTTaskEnterpriseOutlineCode9 | 188744435 | |
| pjPERTTaskEnterpriseProjectCost1 | 188744529 | |
| pjPERTTaskEnterpriseProjectCost10 | 188744538 | |
| pjPERTTaskEnterpriseProjectCost2 | 188744530 | |
| pjPERTTaskEnterpriseProjectCost3 | 188744531 | |
| pjPERTTaskEnterpriseProjectCost4 | 188744532 | |
| pjPERTTaskEnterpriseProjectCost5 | 188744533 | |
| pjPERTTaskEnterpriseProjectCost6 | 188744534 | |
| pjPERTTaskEnterpriseProjectCost7 | 188744535 | |
| pjPERTTaskEnterpriseProjectCost8 | 188744536 | |
| pjPERTTaskEnterpriseProjectCost9 | 188744537 | |
| pjPERTTaskEnterpriseProjectDate1 | 188744539 | |
| pjPERTTaskEnterpriseProjectDate10 | 188744548 | |
| pjPERTTaskEnterpriseProjectDate11 | 188744549 | |
| pjPERTTaskEnterpriseProjectDate12 | 188744550 | |
| pjPERTTaskEnterpriseProjectDate13 | 188744551 | |
| pjPERTTaskEnterpriseProjectDate14 | 188744552 | |
| pjPERTTaskEnterpriseProjectDate15 | 188744553 | |
| pjPERTTaskEnterpriseProjectDate16 | 188744554 | |
| pjPERTTaskEnterpriseProjectDate17 | 188744555 | |
| pjPERTTaskEnterpriseProjectDate18 | 188744556 | |
| pjPERTTaskEnterpriseProjectDate19 | 188744557 | |
| pjPERTTaskEnterpriseProjectDate2 | 188744540 | |
| pjPERTTaskEnterpriseProjectDate20 | 188744558 | |
| pjPERTTaskEnterpriseProjectDate21 | 188744559 | |
| pjPERTTaskEnterpriseProjectDate22 | 188744560 | |
| pjPERTTaskEnterpriseProjectDate23 | 188744561 | |
| pjPERTTaskEnterpriseProjectDate24 | 188744562 | |
| pjPERTTaskEnterpriseProjectDate25 | 188744563 | |
| pjPERTTaskEnterpriseProjectDate26 | 188744564 | |
| pjPERTTaskEnterpriseProjectDate27 | 188744565 | |
| pjPERTTaskEnterpriseProjectDate28 | 188744566 | |
| pjPERTTaskEnterpriseProjectDate29 | 188744567 | |
| pjPERTTaskEnterpriseProjectDate3 | 188744541 | |
| pjPERTTaskEnterpriseProjectDate30 | 188744568 | |
| pjPERTTaskEnterpriseProjectDate4 | 188744542 | |
| pjPERTTaskEnterpriseProjectDate5 | 188744543 | |
| pjPERTTaskEnterpriseProjectDate6 | 188744544 | |
| pjPERTTaskEnterpriseProjectDate7 | 188744545 | |
| pjPERTTaskEnterpriseProjectDate8 | 188744546 | |
| pjPERTTaskEnterpriseProjectDate9 | 188744547 | |
| pjPERTTaskEnterpriseProjectDuration1 | 188744569 | |
| pjPERTTaskEnterpriseProjectDuration10 | 188744578 | |
| pjPERTTaskEnterpriseProjectDuration2 | 188744570 | |
| pjPERTTaskEnterpriseProjectDuration3 | 188744571 | |
| pjPERTTaskEnterpriseProjectDuration4 | 188744572 | |
| pjPERTTaskEnterpriseProjectDuration5 | 188744573 | |
| pjPERTTaskEnterpriseProjectDuration6 | 188744574 | |
| pjPERTTaskEnterpriseProjectDuration7 | 188744575 | |
| pjPERTTaskEnterpriseProjectDuration8 | 188744576 | |
| pjPERTTaskEnterpriseProjectDuration9 | 188744577 | |
| pjPERTTaskEnterpriseProjectFlag1 | 188744649 | |
| pjPERTTaskEnterpriseProjectFlag10 | 188744658 | |
| pjPERTTaskEnterpriseProjectFlag11 | 188744659 | |
| pjPERTTaskEnterpriseProjectFlag12 | 188744660 | |
| pjPERTTaskEnterpriseProjectFlag13 | 188744661 | |
| pjPERTTaskEnterpriseProjectFlag14 | 188744662 | |
| pjPERTTaskEnterpriseProjectFlag15 | 188744663 | |
| pjPERTTaskEnterpriseProjectFlag16 | 188744664 | |
| pjPERTTaskEnterpriseProjectFlag17 | 188744665 | |
| pjPERTTaskEnterpriseProjectFlag18 | 188744666 | |
| pjPERTTaskEnterpriseProjectFlag19 | 188744667 | |
| pjPERTTaskEnterpriseProjectFlag2 | 188744650 | |
| pjPERTTaskEnterpriseProjectFlag20 | 188744668 | |
| pjPERTTaskEnterpriseProjectFlag3 | 188744651 | |
| pjPERTTaskEnterpriseProjectFlag4 | 188744652 | |
| pjPERTTaskEnterpriseProjectFlag5 | 188744653 | |
| pjPERTTaskEnterpriseProjectFlag6 | 188744654 | |
| pjPERTTaskEnterpriseProjectFlag7 | 188744655 | |
| pjPERTTaskEnterpriseProjectFlag8 | 188744656 | |
| pjPERTTaskEnterpriseProjectFlag9 | 188744657 | |
| pjPERTTaskEnterpriseProjectNumber1 | 188744689 | |
| pjPERTTaskEnterpriseProjectNumber10 | 188744698 | |
| pjPERTTaskEnterpriseProjectNumber11 | 188744699 | |
| pjPERTTaskEnterpriseProjectNumber12 | 188744700 | |
| pjPERTTaskEnterpriseProjectNumber13 | 188744701 | |
| pjPERTTaskEnterpriseProjectNumber14 | 188744702 | |
| pjPERTTaskEnterpriseProjectNumber15 | 188744703 | |
| pjPERTTaskEnterpriseProjectNumber16 | 188744704 | |
| pjPERTTaskEnterpriseProjectNumber17 | 188744705 | |
| pjPERTTaskEnterpriseProjectNumber18 | 188744706 | |
| pjPERTTaskEnterpriseProjectNumber19 | 188744707 | |
| pjPERTTaskEnterpriseProjectNumber2 | 188744690 | |
| pjPERTTaskEnterpriseProjectNumber20 | 188744708 | |
| pjPERTTaskEnterpriseProjectNumber21 | 188744709 | |
| pjPERTTaskEnterpriseProjectNumber22 | 188744710 | |
| pjPERTTaskEnterpriseProjectNumber23 | 188744711 | |
| pjPERTTaskEnterpriseProjectNumber24 | 188744712 | |
| pjPERTTaskEnterpriseProjectNumber25 | 188744713 | |
| pjPERTTaskEnterpriseProjectNumber26 | 188744714 | |
| pjPERTTaskEnterpriseProjectNumber27 | 188744715 | |
| pjPERTTaskEnterpriseProjectNumber28 | 188744716 | |
| pjPERTTaskEnterpriseProjectNumber29 | 188744717 | |
| pjPERTTaskEnterpriseProjectNumber3 | 188744691 | |
| pjPERTTaskEnterpriseProjectNumber30 | 188744718 | |
| pjPERTTaskEnterpriseProjectNumber31 | 188744719 | |
| pjPERTTaskEnterpriseProjectNumber32 | 188744720 | |
| pjPERTTaskEnterpriseProjectNumber33 | 188744721 | |
| pjPERTTaskEnterpriseProjectNumber34 | 188744722 | |
| pjPERTTaskEnterpriseProjectNumber35 | 188744723 | |
| pjPERTTaskEnterpriseProjectNumber36 | 188744724 | |
| pjPERTTaskEnterpriseProjectNumber37 | 188744725 | |
| pjPERTTaskEnterpriseProjectNumber38 | 188744726 | |
| pjPERTTaskEnterpriseProjectNumber39 | 188744727 | |
| pjPERTTaskEnterpriseProjectNumber4 | 188744692 | |
| pjPERTTaskEnterpriseProjectNumber40 | 188744728 | |
| pjPERTTaskEnterpriseProjectNumber5 | 188744693 | |
| pjPERTTaskEnterpriseProjectNumber6 | 188744694 | |
| pjPERTTaskEnterpriseProjectNumber7 | 188744695 | |
| pjPERTTaskEnterpriseProjectNumber8 | 188744696 | |
| pjPERTTaskEnterpriseProjectNumber9 | 188744697 | |
| pjPERTTaskEnterpriseProjectOutlineCode1 | 188744589 | |
| pjPERTTaskEnterpriseProjectOutlineCode10 | 188744598 | |
| pjPERTTaskEnterpriseProjectOutlineCode11 | 188744599 | |
| pjPERTTaskEnterpriseProjectOutlineCode12 | 188744600 | |
| pjPERTTaskEnterpriseProjectOutlineCode13 | 188744601 | |
| pjPERTTaskEnterpriseProjectOutlineCode14 | 188744602 | |
| pjPERTTaskEnterpriseProjectOutlineCode15 | 188744603 | |
| pjPERTTaskEnterpriseProjectOutlineCode16 | 188744604 | |
| pjPERTTaskEnterpriseProjectOutlineCode17 | 188744605 | |
| pjPERTTaskEnterpriseProjectOutlineCode18 | 188744606 | |
| pjPERTTaskEnterpriseProjectOutlineCode19 | 188744607 | |
| pjPERTTaskEnterpriseProjectOutlineCode2 | 188744590 | |
| pjPERTTaskEnterpriseProjectOutlineCode20 | 188744608 | |
| pjPERTTaskEnterpriseProjectOutlineCode21 | 188744609 | |
| pjPERTTaskEnterpriseProjectOutlineCode22 | 188744610 | |
| pjPERTTaskEnterpriseProjectOutlineCode23 | 188744611 | |
| pjPERTTaskEnterpriseProjectOutlineCode24 | 188744612 | |
| pjPERTTaskEnterpriseProjectOutlineCode25 | 188744613 | |
| pjPERTTaskEnterpriseProjectOutlineCode26 | 188744614 | |
| pjPERTTaskEnterpriseProjectOutlineCode27 | 188744615 | |
| pjPERTTaskEnterpriseProjectOutlineCode28 | 188744616 | |
| pjPERTTaskEnterpriseProjectOutlineCode29 | 188744617 | |
| pjPERTTaskEnterpriseProjectOutlineCode3 | 188744591 | |
| pjPERTTaskEnterpriseProjectOutlineCode30 | 188744618 | |
| pjPERTTaskEnterpriseProjectOutlineCode4 | 188744592 | |
| pjPERTTaskEnterpriseProjectOutlineCode5 | 188744593 | |
| pjPERTTaskEnterpriseProjectOutlineCode6 | 188744594 | |
| pjPERTTaskEnterpriseProjectOutlineCode7 | 188744595 | |
| pjPERTTaskEnterpriseProjectOutlineCode8 | 188744596 | |
| pjPERTTaskEnterpriseProjectOutlineCode9 | 188744597 | |
| pjPERTTaskEnterpriseProjectText1 | 188744729 | |
| pjPERTTaskEnterpriseProjectText10 | 188744738 | |
| pjPERTTaskEnterpriseProjectText11 | 188744739 | |
| pjPERTTaskEnterpriseProjectText12 | 188744740 | |
| pjPERTTaskEnterpriseProjectText13 | 188744741 | |
| pjPERTTaskEnterpriseProjectText14 | 188744742 | |
| pjPERTTaskEnterpriseProjectText15 | 188744743 | |
| pjPERTTaskEnterpriseProjectText16 | 188744744 | |
| pjPERTTaskEnterpriseProjectText17 | 188744745 | |
| pjPERTTaskEnterpriseProjectText18 | 188744746 | |
| pjPERTTaskEnterpriseProjectText19 | 188744747 | |
| pjPERTTaskEnterpriseProjectText2 | 188744730 | |
| pjPERTTaskEnterpriseProjectText20 | 188744748 | |
| pjPERTTaskEnterpriseProjectText21 | 188744749 | |
| pjPERTTaskEnterpriseProjectText22 | 188744750 | |
| pjPERTTaskEnterpriseProjectText23 | 188744751 | |
| pjPERTTaskEnterpriseProjectText24 | 188744752 | |
| pjPERTTaskEnterpriseProjectText25 | 188744753 | |
| pjPERTTaskEnterpriseProjectText26 | 188744754 | |
| pjPERTTaskEnterpriseProjectText27 | 188744755 | |
| pjPERTTaskEnterpriseProjectText28 | 188744756 | |
| pjPERTTaskEnterpriseProjectText29 | 188744757 | |
| pjPERTTaskEnterpriseProjectText3 | 188744731 | |
| pjPERTTaskEnterpriseProjectText30 | 188744758 | |
| pjPERTTaskEnterpriseProjectText31 | 188744759 | |
| pjPERTTaskEnterpriseProjectText32 | 188744760 | |
| pjPERTTaskEnterpriseProjectText33 | 188744761 | |
| pjPERTTaskEnterpriseProjectText34 | 188744762 | |
| pjPERTTaskEnterpriseProjectText35 | 188744763 | |
| pjPERTTaskEnterpriseProjectText36 | 188744764 | |
| pjPERTTaskEnterpriseProjectText37 | 188744765 | |
| pjPERTTaskEnterpriseProjectText38 | 188744766 | |
| pjPERTTaskEnterpriseProjectText39 | 188744767 | |
| pjPERTTaskEnterpriseProjectText4 | 188744732 | |
| pjPERTTaskEnterpriseProjectText40 | 188744768 | |
| pjPERTTaskEnterpriseProjectText5 | 188744733 | |
| pjPERTTaskEnterpriseProjectText6 | 188744734 | |
| pjPERTTaskEnterpriseProjectText7 | 188744735 | |
| pjPERTTaskEnterpriseProjectText8 | 188744736 | |
| pjPERTTaskEnterpriseProjectText9 | 188744737 | |
| pjPERTTaskEnterpriseText1 | 188744479 | |
| pjPERTTaskEnterpriseText10 | 188744488 | |
| pjPERTTaskEnterpriseText11 | 188744489 | |
| pjPERTTaskEnterpriseText12 | 188744490 | |
| pjPERTTaskEnterpriseText13 | 188744491 | |
| pjPERTTaskEnterpriseText14 | 188744492 | |
| pjPERTTaskEnterpriseText15 | 188744493 | |
| pjPERTTaskEnterpriseText16 | 188744494 | |
| pjPERTTaskEnterpriseText17 | 188744495 | |
| pjPERTTaskEnterpriseText18 | 188744496 | |
| pjPERTTaskEnterpriseText19 | 188744497 | |
| pjPERTTaskEnterpriseText2 | 188744480 | |
| pjPERTTaskEnterpriseText20 | 188744498 | |
| pjPERTTaskEnterpriseText21 | 188744499 | |
| pjPERTTaskEnterpriseText22 | 188744500 | |
| pjPERTTaskEnterpriseText23 | 188744501 | |
| pjPERTTaskEnterpriseText24 | 188744502 | |
| pjPERTTaskEnterpriseText25 | 188744503 | |
| pjPERTTaskEnterpriseText26 | 188744504 | |
| pjPERTTaskEnterpriseText27 | 188744505 | |
| pjPERTTaskEnterpriseText28 | 188744506 | |
| pjPERTTaskEnterpriseText29 | 188744507 | |
| pjPERTTaskEnterpriseText3 | 188744481 | |
| pjPERTTaskEnterpriseText30 | 188744508 | |
| pjPERTTaskEnterpriseText31 | 188744509 | |
| pjPERTTaskEnterpriseText32 | 188744510 | |
| pjPERTTaskEnterpriseText33 | 188744511 | |
| pjPERTTaskEnterpriseText34 | 188744512 | |
| pjPERTTaskEnterpriseText35 | 188744513 | |
| pjPERTTaskEnterpriseText36 | 188744514 | |
| pjPERTTaskEnterpriseText37 | 188744515 | |
| pjPERTTaskEnterpriseText38 | 188744516 | |
| pjPERTTaskEnterpriseText39 | 188744517 | |
| pjPERTTaskEnterpriseText4 | 188744482 | |
| pjPERTTaskEnterpriseText40 | 188744518 | |
| pjPERTTaskEnterpriseText5 | 188744483 | |
| pjPERTTaskEnterpriseText6 | 188744484 | |
| pjPERTTaskEnterpriseText7 | 188744485 | |
| pjPERTTaskEnterpriseText8 | 188744486 | |
| pjPERTTaskEnterpriseText9 | 188744487 | |
| pjPERTTaskErrorMessage | 188744847 | |
| pjPERTTaskEstimated | 188744076 | |
| pjPERTTaskExternalTask | 188743912 | |
| pjPERTTaskFinish | 188743716 | |
| pjPERTTaskFinish1 | 188743733 | |
| pjPERTTaskFinish10 | 188743971 | |
| pjPERTTaskFinish2 | 188743736 | |
| pjPERTTaskFinish3 | 188743739 | |
| pjPERTTaskFinish4 | 188743742 | |
| pjPERTTaskFinish5 | 188743745 | |
| pjPERTTaskFinish6 | 188743963 | |
| pjPERTTaskFinish7 | 188743965 | |
| pjPERTTaskFinish8 | 188743967 | |
| pjPERTTaskFinish9 | 188743969 | |
| pjPERTTaskFinishSlack | 188744119 | |
| pjPERTTaskFinishText | 188744966 | |
| pjPERTTaskFinishVariance | 188743726 | |
| pjPERTTaskFixedCost | 188743688 | |
| pjPERTTaskFixedCostAccrual | 188743880 | |
| pjPERTTaskFlag1 | 188743752 | |
| pjPERTTaskFlag10 | 188743761 | |
| pjPERTTaskFlag11 | 188743972 | |
| pjPERTTaskFlag12 | 188743973 | |
| pjPERTTaskFlag13 | 188743974 | |
| pjPERTTaskFlag14 | 188743975 | |
| pjPERTTaskFlag15 | 188743976 | |
| pjPERTTaskFlag16 | 188743977 | |
| pjPERTTaskFlag17 | 188743978 | |
| pjPERTTaskFlag18 | 188743979 | |
| pjPERTTaskFlag19 | 188743980 | |
| pjPERTTaskFlag2 | 188743753 | |
| pjPERTTaskFlag20 | 188743981 | |
| pjPERTTaskFlag3 | 188743754 | |
| pjPERTTaskFlag4 | 188743755 | |
| pjPERTTaskFlag5 | 188743756 | |
| pjPERTTaskFlag6 | 188743757 | |
| pjPERTTaskFlag7 | 188743758 | |
| pjPERTTaskFlag8 | 188743759 | |
| pjPERTTaskFlag9 | 188743760 | |
| pjPERTTaskFreeSlack | 188743701 | |
| pjPERTTaskGroupBySummary | 188744126 | |
| pjPERTTaskGuid | 188744823 | |
| pjPERTTaskHideBar | 188743789 | |
| pjPERTTaskHyperlink | 188743897 | |
| pjPERTTaskHyperlinkAddress | 188743898 | |
| pjPERTTaskHyperlinkHref | 188743900 | |
| pjPERTTaskHyperlinkSubAddress | 188743899 | |
| pjPERTTaskID | 188743703 | |
| pjPERTTaskIgnoreResourceCalendar | 188744079 | |
| pjPERTTaskIgnoreWarnings | 188745012 | |
| pjPERTTaskIsAssn | 188743904 | |
| pjPERTTaskIsPublished | 188744845 | |
| pjPERTTaskLateFinish | 188743720 | |
| pjPERTTaskLateStart | 188743719 | |
| pjPERTTaskLevelAssignments | 188743933 | |
| pjPERTTaskLevelingCanSplit | 188743932 | |
| pjPERTTaskLevelingDelay | 188743700 | |
| pjPERTTaskLinkedFields | 188743778 | |
| pjPERTTaskManual | 188744960 | |
| pjPERTTaskMarked | 188743751 | |
| pjPERTTaskMilestone | 188743704 | |
| pjPERTTaskName | 188743694 | |
| pjPERTTaskNotes | 188743695 | |
| pjPERTTasknull_prop | 188744808 | |
| pjPERTTaskNumber1 | 188743767 | |
| pjPERTTaskNumber10 | 188743986 | |
| pjPERTTaskNumber11 | 188743987 | |
| pjPERTTaskNumber12 | 188743988 | |
| pjPERTTaskNumber13 | 188743989 | |
| pjPERTTaskNumber14 | 188743990 | |
| pjPERTTaskNumber15 | 188743991 | |
| pjPERTTaskNumber16 | 188743992 | |
| pjPERTTaskNumber17 | 188743993 | |
| pjPERTTaskNumber18 | 188743994 | |
| pjPERTTaskNumber19 | 188743995 | |
| pjPERTTaskNumber2 | 188743768 | |
| pjPERTTaskNumber20 | 188743996 | |
| pjPERTTaskNumber3 | 188743769 | |
| pjPERTTaskNumber4 | 188743770 | |
| pjPERTTaskNumber5 | 188743771 | |
| pjPERTTaskNumber6 | 188743982 | |
| pjPERTTaskNumber7 | 188743983 | |
| pjPERTTaskNumber8 | 188743984 | |
| pjPERTTaskNumber9 | 188743985 | |
| pjPERTTaskObjects | 188743777 | |
| pjPERTTaskOutlineCode1 | 188744096 | |
| pjPERTTaskOutlineCode10 | 188744114 | |
| pjPERTTaskOutlineCode2 | 188744098 | |
| pjPERTTaskOutlineCode3 | 188744100 | |
| pjPERTTaskOutlineCode4 | 188744102 | |
| pjPERTTaskOutlineCode5 | 188744104 | |
| pjPERTTaskOutlineCode6 | 188744106 | |
| pjPERTTaskOutlineCode7 | 188744108 | |
| pjPERTTaskOutlineCode8 | 188744110 | |
| pjPERTTaskOutlineCode9 | 188744112 | |
| pjPERTTaskOutlineLevel | 188743765 | |
| pjPERTTaskOutlineNumber | 188743782 | |
| pjPERTTaskOverallocated | 188743905 | |
| pjPERTTaskOvertimeCost | 188743848 | |
| pjPERTTaskOvertimeWork | 188743843 | |
| pjPERTTaskPercentComplete | 188743712 | |
| pjPERTTaskPercentWorkComplete | 188743713 | |
| pjPERTTaskPhysicalPercentComplete | 188744799 | |
| pjPERTTaskPlaceholder | 188744961 | |
| pjPERTTaskPredecessors | 188743727 | |
| pjPERTTaskPreLeveledFinish | 188744050 | |
| pjPERTTaskPreLeveledStart | 188744049 | |
| pjPERTTaskPriority | 188743705 | |
| pjPERTTaskProject | 188743764 | |
| pjPERTTaskRecurring | 188743809 | |
| pjPERTTaskRegularWork | 188743846 | |
| pjPERTTaskRemainingCost | 188743690 | |
| pjPERTTaskRemainingDuration | 188743711 | |
| pjPERTTaskRemainingOvertimeCost | 188743850 | |
| pjPERTTaskRemainingOvertimeWork | 188743845 | |
| pjPERTTaskRemainingWork | 188743684 | |
| pjPERTTaskResourceEnterpriseMultiValue20 | 188744809 | |
| pjPERTTaskResourceEnterpriseMultiValue21 | 188744810 | |
| pjPERTTaskResourceEnterpriseMultiValue22 | 188744811 | |
| pjPERTTaskResourceEnterpriseMultiValue23 | 188744812 | |
| pjPERTTaskResourceEnterpriseMultiValue24 | 188744813 | |
| pjPERTTaskResourceEnterpriseMultiValue25 | 188744814 | |
| pjPERTTaskResourceEnterpriseMultiValue26 | 188744815 | |
| pjPERTTaskResourceEnterpriseMultiValue27 | 188744816 | |
| pjPERTTaskResourceEnterpriseMultiValue28 | 188744817 | |
| pjPERTTaskResourceEnterpriseMultiValue29 | 188744818 | |
| pjPERTTaskResourceEnterpriseOutlineCode1 | 188744769 | |
| pjPERTTaskResourceEnterpriseOutlineCode10 | 188744778 | |
| pjPERTTaskResourceEnterpriseOutlineCode11 | 188744779 | |
| pjPERTTaskResourceEnterpriseOutlineCode12 | 188744780 | |
| pjPERTTaskResourceEnterpriseOutlineCode13 | 188744781 | |
| pjPERTTaskResourceEnterpriseOutlineCode14 | 188744782 | |
| pjPERTTaskResourceEnterpriseOutlineCode15 | 188744783 | |
| pjPERTTaskResourceEnterpriseOutlineCode16 | 188744784 | |
| pjPERTTaskResourceEnterpriseOutlineCode17 | 188744785 | |
| pjPERTTaskResourceEnterpriseOutlineCode18 | 188744786 | |
| pjPERTTaskResourceEnterpriseOutlineCode19 | 188744787 | |
| pjPERTTaskResourceEnterpriseOutlineCode2 | 188744770 | |
| pjPERTTaskResourceEnterpriseOutlineCode20 | 188744788 | |
| pjPERTTaskResourceEnterpriseOutlineCode21 | 188744789 | |
| pjPERTTaskResourceEnterpriseOutlineCode22 | 188744790 | |
| pjPERTTaskResourceEnterpriseOutlineCode23 | 188744791 | |
| pjPERTTaskResourceEnterpriseOutlineCode24 | 188744792 | |
| pjPERTTaskResourceEnterpriseOutlineCode25 | 188744793 | |
| pjPERTTaskResourceEnterpriseOutlineCode26 | 188744794 | |
| pjPERTTaskResourceEnterpriseOutlineCode27 | 188744795 | |
| pjPERTTaskResourceEnterpriseOutlineCode28 | 188744796 | |
| pjPERTTaskResourceEnterpriseOutlineCode29 | 188744797 | |
| pjPERTTaskResourceEnterpriseOutlineCode3 | 188744771 | |
| pjPERTTaskResourceEnterpriseOutlineCode30 | 188744798 | |
| pjPERTTaskResourceEnterpriseOutlineCode4 | 188744772 | |
| pjPERTTaskResourceEnterpriseOutlineCode5 | 188744773 | |
| pjPERTTaskResourceEnterpriseOutlineCode6 | 188744774 | |
| pjPERTTaskResourceEnterpriseOutlineCode7 | 188744775 | |
| pjPERTTaskResourceEnterpriseOutlineCode8 | 188744776 | |
| pjPERTTaskResourceEnterpriseOutlineCode9 | 188744777 | |
| pjPERTTaskResourceGroup | 188743793 | |
| pjPERTTaskResourceInitials | 188743730 | |
| pjPERTTaskResourceNames | 188743729 | |
| pjPERTTaskResourcePhonetics | 188744029 | |
| pjPERTTaskResourceType | 188744131 | |
| pjPERTTaskResponsePending | 188743930 | |
| pjPERTTaskResume | 188743779 | |
| pjPERTTaskRollup | 188743762 | |
| pjPERTTaskSheetNotes | 188743774 | |
| pjPERTTaskSPI | 188744218 | |
| pjPERTTaskStart | 188743715 | |
| pjPERTTaskStart1 | 188743732 | |
| pjPERTTaskStart10 | 188743970 | |
| pjPERTTaskStart2 | 188743735 | |
| pjPERTTaskStart3 | 188743738 | |
| pjPERTTaskStart4 | 188743741 | |
| pjPERTTaskStart5 | 188743744 | |
| pjPERTTaskStart6 | 188743962 | |
| pjPERTTaskStart7 | 188743964 | |
| pjPERTTaskStart8 | 188743966 | |
| pjPERTTaskStart9 | 188743968 | |
| pjPERTTaskStartSlack | 188744118 | |
| pjPERTTaskStartText | 188744965 | |
| pjPERTTaskStartVariance | 188743725 | |
| pjPERTTaskStatus | 188744223 | |
| pjPERTTaskStatusManagerName | 188744846 | |
| pjPERTTaskStop | 188743780 | |
| pjPERTTaskSubproject | 188743706 | |
| pjPERTTaskSubprojectReadOnly | 188743926 | |
| pjPERTTaskSuccessors | 188743728 | |
| pjPERTTaskSummary | 188743772 | |
| pjPERTTaskSV | 188743693 | |
| pjPERTTaskSVPercent | 188744220 | |
| pjPERTTaskTCPI | 188744222 | |
| pjPERTTaskTeamStatusPending | 188743931 | |
| pjPERTTaskText1 | 188743731 | |
| pjPERTTaskText10 | 188743750 | |
| pjPERTTaskText11 | 188743997 | |
| pjPERTTaskText12 | 188743998 | |
| pjPERTTaskText13 | 188743999 | |
| pjPERTTaskText14 | 188744000 | |
| pjPERTTaskText15 | 188744001 | |
| pjPERTTaskText16 | 188744002 | |
| pjPERTTaskText17 | 188744003 | |
| pjPERTTaskText18 | 188744004 | |
| pjPERTTaskText19 | 188744005 | |
| pjPERTTaskText2 | 188743734 | |
| pjPERTTaskText20 | 188744006 | |
| pjPERTTaskText21 | 188744007 | |
| pjPERTTaskText22 | 188744008 | |
| pjPERTTaskText23 | 188744009 | |
| pjPERTTaskText24 | 188744010 | |
| pjPERTTaskText25 | 188744011 | |
| pjPERTTaskText26 | 188744012 | |
| pjPERTTaskText27 | 188744013 | |
| pjPERTTaskText28 | 188744014 | |
| pjPERTTaskText29 | 188744015 | |
| pjPERTTaskText3 | 188743737 | |
| pjPERTTaskText30 | 188744016 | |
| pjPERTTaskText4 | 188743740 | |
| pjPERTTaskText5 | 188743743 | |
| pjPERTTaskText6 | 188743746 | |
| pjPERTTaskText7 | 188743747 | |
| pjPERTTaskText8 | 188743748 | |
| pjPERTTaskText9 | 188743749 | |
| pjPERTTaskTotalSlack | 188743702 | |
| pjPERTTaskType | 188743808 | |
| pjPERTTaskUniqueID | 188743766 | |
| pjPERTTaskUniquePredecessors | 188743775 | |
| pjPERTTaskUniqueSuccessors | 188743776 | |
| pjPERTTaskUpdateNeeded | 188743791 | |
| pjPERTTaskVAC | 188744121 | |
| pjPERTTaskWarning | 188744962 | |
| pjPERTTaskWBS | 188743696 | |
| pjPERTTaskWBSPredecessors | 188744129 | |
| pjPERTTaskWBSSuccessors | 188744130 | |
| pjPERTTaskWork | 188743680 | |
| pjPERTTaskWorkContour | 188743936 | |
| pjPERTTaskWorkVariance | 188743683 |