3.3.7.21 Synchronization Connection Down
The Synchronization Connection Down event MUST be signaled with the following argument:
An LU Pair object
If the Synchronization Connection Down event is signaled, the Transaction Manager Communicating with an LU 6.2 Implementation Facet MUST perform the following actions:
If the LU Pair object is set:
If the LU Pair Recovery State field of the provided LU Pair object is set to either Synchronizing No Remote Name, Synchronizing Have Remote Name, Synchronized, or Synchronized Awaiting LU Status:
Set the LU Pair Recovery State field of the provided LU Pair object to Not Synchronized.
If the Is Warm flag of the provided LU Pair object is set to FALSE:
Unset the Remote Log Name field of the provided LU Pair object.
Signal the Obsolete All XLN Exchanges event with the following argument:
The provided LU Pair object
Signal the Recovery Work Ready event with the following arguments:
The provided LU Pair object
The Recovery Work Ready Reason set to Miscellaneous.
Otherwise:
Ignore the event.