3.3.5.1.2.1 Construction of Secondary Drawing Orders
All secondary drawing orders are identified by the Secondary Drawing Order Header (section 2.2.2.2.1.2.1.1). Client support for a given secondary order is determined by the capabilities advertised by the client.