Capacity Planning Guide

Applies To: Forefront Identity Manager, Forefront Identity Manager 2010

This document is a work in progress and contains preliminary information about Microsoft® Forefront® Identity Manager (FIM) 2010 capacity planning. Microsoft is running additional tests to provide additional information. As that information becomes available, it will be added to this document and republished. This document is being released now to assist you in the early planning of FIM 2010 deployments.

A downloadable copy of this document is available on the Microsoft download center as Forefront Identity Manager (FIM) 2010 Capacity Planning Guide(https://go.microsoft.com/fwlink/?LinkId=200180).

Overview

There are a number of variables that can affect the overall capacity and performance of your FIM 2010 deployment. The ways in which you physically deploy the FIM 2010 R2 components (topology), as well as the hardware on which those components run, are important factors in determining the performance and capacity that you can expect from your FIM 2010 R2 deployment. The number and complexity of the FIM 2010 R2 policy configuration objects may be less obvious, but they are still significant factors to consider when planning for capacity. Finally, the expected scale of the deployment, as well as the load that is expected to be placed on it, are typically more obvious factors that affect performance and capacity.

The main factors that affect the capacity and performance that can be expected from a FIM 2010 R2 deployment are discussed in the following table.

Design factor Considerations

Topology

The distribution of the FIM 2010 R2 services among computers on the network. For example, will the FIM 2010 R2 Synchronization Service be hosted on the same computer that hosts its database?

Hardware

The physical hardware and any virtualized hardware specifications that you are running for each FIM 2010 R2 component. This includes CPU, memory, network adapter, and hard drive configuration.

FIM policy configuration objects

The number and type of FIM 2010 R2 policy configuration objects, which includes sets, Management Policy Rules (MPRs), and workflows. For example, how many workflows are triggered for operations? How many set definitions exist and what is the relative complexity of each?

Scale

The number of users, groups, calculated groups, and custom object types, such as computers to be managed by FIM 2010 R2. Also, consider the complexity of dynamic groups, and be sure to factor in group nesting.

Load

Frequency of anticipated use. For example, the number of times that you expect new groups or users to be created, passwords to be reset, or the portal to be visited in a given time period. Note that the load may vary during the course of an hour, day, week, or year. Depending on the component, you may have to design for peak load or average load.

FIM 2010 has many different components. In many cases, these components are not located on the same computer. When you think of FIM 2010 from a capacity planning perspective, the components and the physical computers (and, possibly, virtual machines) on which they are hosted are key considerations. Many potential factors can affect the performance of the FIM 2010 environment, for example, the physical disk configuration for the computer running the FIM 2010 R2 Service SQL Database. The number of spindles that make up the disk configuration or the distribution of log and data files can affect the performance of the system significantly. Also, consider the external factors in your configuration. If you are using a SAN as the FIM 2010 R2 Service database configuration, what other applications are sharing the SAN? How do these applications affect database performance as they compete for the shared disk resources on the SAN? When multiple applications compete for the same disk resources, bottlenecks and irregular disk performance might be the result.

The number of users and groups in your environment is a typical consideration when you think about the scale of a deployment. However, there are several other related considerations that you should also factor into planning your FIM 2010. These other considerations include the following:

  • Can users create groups? If so, you should consider estimating how users creating new groups will affect the growth of groups in your environment.

  • Will dynamic groups be deployed?

    • What types of dynamic groups will be deployed?

    • How many dynamic groups are likely to be deployed?

You should also consider the type of load that will be placed on the FIM 2010 components. Some relevant questions to consider include the following:

  • How often do you expect a request to join or leave a group?

  • How often do you expect a user to create a static or dynamic group?

  • Can you obtain this information from existing applications in your environment?

  • How much load do you expect from non-user-driven operations, such as the synchronization of changes from external systems? Ensure that you account for load that is generated by synchronization operations of identity information with external systems.

  • What kind of scenarios do you plan to deploy? Different scenarios will contribute to different load patterns. For example, client computers that have the FIM client installed periodically validate if registration is required at logon, which increases your system load.

  • Do you expect large variations in load levels, from normal to peak load? For example, do you expect large numbers of password resets after holiday periods? Make sure that you work your system maintenance and synchronization schedules outside the anticipated usage peaks. When you think of capacity planning, ensure that you factor in peak load periods.

Warning

This guide was produced to assist in customer planning, but it should not be used alone to determine the appropriate servers, hardware, or topologies that are required for a FIM 2010 R2 deployment. Organizations are encouraged and expected to configure their own test environments to more accurately estimate capacity and performance. Microsoft cannot guarantee that organizations will experience the same capacity or performance characteristics, even if the FIM 2010 R2 components are deployed and configured identically to the components that are described in this guide.

FIM policy configuration objects represent the business logic for the FIM deployment. This is one area in which each FIM implementation will probably be unique because policy configuration is specific to the needs of each deployment. FIM policy configuration objects include the MPRs, sets, workflows, and synchronization rules for a particular deployment. Although FIM deployments are not likely to be identical, the following table describes the policy resources that were part of the test environment. The Active Directory® Domain Services (AD DS) configuration of this environment included policy configuration for four forests with eight domains. Key performance considerations related to FIM policy configuration objects include the following:

  • Sets – Every operation in the system must be evaluated against existing set memberships and updates that cause changes in set membership. For example, a simple change, such as change to the building number of an individual’s office, may not have a huge impact. However, other changes might have a cascading impact, such as the change of a manager, which may affect multiple objects at multiple levels.

  • MPRs – MPRs are used for controlling access control rules and triggering workflows. As you create MPRs, you may find that there is a need to increase the number of sets so that you can capture various object transition states. These additional sets may trigger additional workflows, with each workflow mapping to unique requests in the system. This then becomes another item to include when you plan capacity.

Additional considerations that are related to FIM policy configuration objects include the following:

  • Will you be provisioning foreign security principles across multiple Active Directory Domain Services (AD DS) forests? Doing so will generate additional workflows and requests, which results in additional load on the system.

  • Will you use codeless provisioning? If so, this affects the number of expected rules entries, as well associated requests and workflows in the system.

To prepare properly for FIM 2010 deployment, you first simulate your anticipated production environment in a lab setting and test it. You may decide to test different topologies running on different types of hardware, and then run different scale and load scenario tests, which can help you better estimate what may happen when you deploy FIM 2010 in your environment.