IScheduledWorkItem::GetMostRecentRunTime method

[[This API may be altered or unavailable in subsequent versions of the operating system or product. Please use the Task Scheduler 2.0 Interfaces instead.] ]

Retrieves the most recent time the work item began running.

Syntax

HRESULT GetMostRecentRunTime(
  SYSTEMTIME *pstLastRun
);

Parameters

pstLastRun

A pointer to a SYSTEMTIME structure that contains the most recent time the current work item ran.

Return Value

The GetMostRecentRunTime method returns one of the following values.

Return code Description
S_OK
The operation was successful.
E_INVALIDARG
The arguments are not valid.
E_OUTOFMEMORY
Not enough memory is available.
SCHED_S_TASK_HAS_NOT_RUN
The work item has never run.

Requirements

   
Minimum supported client Windows 2000 Professional [desktop apps only]
Minimum supported server Windows 2000 Server [desktop apps only]
Target Platform Windows
Header mstask.h
Library Mstask.lib
DLL Mstask.dll
Redistributable Internet Explorer 4.0 or later on Windows NT 4.0 and Windows 95

See Also

GetNextRunTime

IScheduledWorkItem