StripLine.IntervalType 属性
定义
public:
property System::Web::UI::DataVisualization::Charting::DateTimeIntervalType IntervalType { System::Web::UI::DataVisualization::Charting::DateTimeIntervalType get(); void set(System::Web::UI::DataVisualization::Charting::DateTimeIntervalType value); };
[System.ComponentModel.Bindable(true)]
[System.Web.UI.PersistenceMode(System.Web.UI.PersistenceMode.Attribute)]
public System.Web.UI.DataVisualization.Charting.DateTimeIntervalType IntervalType { get; set; }
[<System.ComponentModel.Bindable(true)>]
[<System.Web.UI.PersistenceMode(System.Web.UI.PersistenceMode.Attribute)>]
member this.IntervalType : System.Web.UI.DataVisualization.Charting.DateTimeIntervalType with get, set
Public Property IntervalType As DateTimeIntervalType
属性值
一个 DateTimeIntervalType 枚举值,该值指示间隔类型。A DateTimeIntervalType enumeration value that indicates the interval type. 默认值是 Auto。The default value is Auto.
- 属性
示例
下面的代码示例演示了条带线的三个应用程序。The following code example demonstrates three applications of strip lines. 首先,按重复间隔添加水平条带线。First, horizontal strip lines are added at recurring intervals. 其次,将添加垂直条带线以突出显示周末数据点。Second, vertical strip lines are added to highlight weekend data points. 最后,添加一个非重复条带线,以表示图表第一个序列中数据点的平均值。Lastly, a non-recurring strip line is added to denote the mean of the data points in the first series of the chart.
Imports System.Web.UI.DataVisualization.Charting
Public Partial Class StripLines
Inherits System.Web.UI.Page
Protected Sub Page_Load(ByVal sender As Object, ByVal e As EventArgs)
' Add chart data before adding strip lines.
AddChartData()
' Adds repeating horizontal strip lines.
AddHorizRepeatingStripLines()
' Highlights weekend points using strip lines.
HighlightWeekendsWithStripLines()
' Adds a threshold line using strip lines.
AddThresholdStripLine()
End Sub
''' <summary>
''' Adds a week of data with values between 20 and 35.
''' </summary>
Private Sub AddChartData()
' Declare new random variable
Dim rand As New Random()
For i As Integer = 0 To 6
' Add a week of data
chart1.Series(0).Points.AddXY(DateTime.Now.AddDays(i), rand.[Next](20, 35))
Next
End Sub
''' <summary>
''' Adds repeating horizontal strip lines at intervals of 5.
''' </summary>
Private Sub AddHorizRepeatingStripLines()
' Instantiate new strip line
Dim stripLine1 As New StripLine()
stripLine1.StripWidth = 2.5
stripLine1.Interval = 5
' Consider adding transparency so that the strip lines are lighter
stripLine1.BackColor = Color.FromArgb(120, Color.Red)
' Add the strip line to the chart
chart1.ChartAreas(0).AxisY.StripLines.Add(stripLine1)
End Sub
''' <summary>
''' Adds strip lines to highlight weekend values.
''' </summary>
Private Sub HighlightWeekendsWithStripLines()
' Set strip line to highlight weekends
Dim stripLine2 As New StripLine()
stripLine2.BackColor = Color.FromArgb(120, Color.Gold)
stripLine2.IntervalOffset = -1.5
stripLine2.IntervalOffsetType = DateTimeIntervalType.Days
stripLine2.Interval = 1
stripLine2.IntervalType = DateTimeIntervalType.Weeks
stripLine2.StripWidth = 2
stripLine2.StripWidthType = DateTimeIntervalType.Days
' Add strip line to the chart
chart1.ChartAreas(0).AxisX.StripLines.Add(stripLine2)
' Set the axis label to show the name of the day
' This is done in order to demonstrate that weekends are highlighted
chart1.ChartAreas(0).AxisX.LabelStyle.Format = "ddd"
End Sub
''' <summary>
''' Adds a horizontal threshold strip line at the calculated mean
''' value of all data points in the first series of the chart.
''' </summary>
Private Sub AddThresholdStripLine()
Dim stripLine3 As New StripLine()
' Set threshold line so that it is only shown once
stripLine3.Interval = 0
' Set the threshold line to be drawn at the calculated mean of the first series
stripLine3.IntervalOffset = chart1.DataManipulator.Statistics.Mean(chart1.Series(0).Name)
stripLine3.BackColor = Color.DarkGreen
stripLine3.StripWidth = 0.25
' Set text properties for the threshold line
stripLine3.Text = "Mean"
stripLine3.ForeColor = Color.Black
' Add strip line to the chart
chart1.ChartAreas(0).AxisY.StripLines.Add(stripLine3)
End Sub
End Class
public partial class StripLines : System.Web.UI.Page
{
protected void Page_Load(object sender, EventArgs e)
{
// Add chart data
AddChartData();
// Adds repeating horizontal strip lines.
AddHorizRepeatingStripLines();
// Highlights weekend points using strip lines.
HighlightWeekendsWithStripLines();
// Adds a threshold line using strip lines.
AddThresholdStripLine();
}
/// <summary>
/// Adds a week of data with values between 20 and 35.
/// </summary>
private void AddChartData()
{
// Declare new random variable
Random rand = new Random();
// Add a week of data
for (int i = 0; i < 7; i++)
{
chart1.Series[0].Points.AddXY(DateTime.Now.AddDays(i), rand.Next(20,35));
}
}
/// <summary>
/// Adds repeating horizontal strip lines at intervals of 5.
/// </summary>
private void AddHorizRepeatingStripLines()
{
// Instantiate new strip line
StripLine stripLine1 = new StripLine();
stripLine1.StripWidth = 0;
stripLine1.BorderColor = Color.Black;
stripLine1.BorderWidth = 3;
stripLine1.Interval = 5;
// Consider adding transparency so that the strip lines are lighter
stripLine1.BackColor = Color.FromArgb(120, Color.Red);
stripLine1.BackSecondaryColor = Color.Black;
stripLine1.BackGradientStyle = GradientStyle.LeftRight;
// Add the strip line to the chart
chart1.ChartAreas[0].AxisY.StripLines.Add(stripLine1);
}
/// <summary>
/// Adds strip lines to highlight weekend values.
/// </summary>
private void HighlightWeekendsWithStripLines()
{
// Set strip line to highlight weekends
StripLine stripLine2 = new StripLine();
stripLine2.BackColor = Color.FromArgb(120, Color.Gold);
stripLine2.IntervalOffset = -1.5;
stripLine2.IntervalOffsetType = DateTimeIntervalType.Days;
stripLine2.Interval = 1;
stripLine2.IntervalType = DateTimeIntervalType.Weeks;
stripLine2.StripWidth = 2;
stripLine2.StripWidthType = DateTimeIntervalType.Days;
// Add strip line to the chart
chart1.ChartAreas[0].AxisX.StripLines.Add(stripLine2);
// Set the axis label to show the name of the day
// This is done in order to demonstrate that weekends are highlighted
chart1.ChartAreas[0].AxisX.LabelStyle.Format = "ddd";
}
/// <summary>
/// Adds a horizontal threshold strip line at the calculated mean
/// value of all data points in the first series of the chart.
/// </summary>
private void AddThresholdStripLine()
{
StripLine stripLine3 = new StripLine();
// Set threshold line so that it is only shown once
stripLine3.Interval = 0;
// Set the threshold line to be drawn at the calculated mean of the first series
stripLine3.IntervalOffset = chart1.DataManipulator.Statistics.Mean(chart1.Series[0].Name);
stripLine3.BackColor = Color.DarkGreen;
stripLine3.StripWidth = 0.25;
// Set text properties for the threshold line
stripLine3.Text = "Mean";
stripLine3.ForeColor = Color.Black;
// Add strip line to the chart
chart1.ChartAreas[0].AxisY.StripLines.Add(stripLine3);
}
}
注解
间隔类型可以设置为 Auto ,在这种情况下,类型依赖于:绘制对象的 X 值或 Y 值类型, DataPoint 具体取决于 StripLine 对象所属的轴和轴刻度。Interval types can be set to Auto, in which case the type depends on: the X-value or Y-value types of the plotted DataPoint objects - depending on which axis the StripLine objects belong to - and the axis scale.
Interval属性确定条带或线条的绘制频率。The Interval property determines how often a strip or line is drawn.