Type Element (Multiple Parents)

As a child of the Mask or WBSMask elements, Type is the type of code string for first-level tasks (numbers, letters, or unordered characters).

In a Task element, Type is the type of task (fixed units, fixed duration, or fixed work).

In a PredecessorLink element, Type is the type of task link (FF, FS, SF or SS).

In a Resource element, Type is the type of resource (material or work).

In an Exception element, Type is the calendar exception type (daily, weekly, and so on).

In a Value element, Type is the type of outline code (date, duration, text, and so on).

In TimephasedData element, Type is one of the 76 types of timephased data.

<Type>
  IntegerValue
</Type>

Parent Elements

MaskWBSMaskTaskPredecessorLinkResource, Exception Element, Value ElementTimephasedData

Element Properties for Mask or WBSMask:

The Type element has an integer value that represents the type of code string for first-level tasks.

Value

Description

0

Numbers (ordered); a numeric WBS code for this level (default).

1

Uppercase Letters (ordered); uppercase, alphabetical WBS codes (for example, A, B, and C for the first three summary tasks in the project).

2

Lowercase Letters (ordered); lowercase, alphabetical WBS codes (for example, a, b, and c for the first three summary tasks in the project).

3

Characters (unordered); any combination of numbers and uppercase or lowercase letters; for example, Arch1, Const1, or Insp1 for the first three summary tasks in the project. Project 2007 displays an asterisk (*) in the custom outline field until you type or enter a string of characters for the code.

Element Properties for Task:

The Type element has an integer value that represents the type of task.

Value

Description

0

Fixed units

1

Fixed duration

2

Fixed work

The Type element has an integer value that represents the type of task link.

Value

Description

0

FF (finish-to-finish)

1

FS (finish-to-start)

2

SF (start-to-finish)

3

SS (start-to-start)

Element Properties for Resource:

The Type element has an integer value that represents the resource type (work, material, or cost).

Value

Description

0

Material (consumable supplies like steel, concrete, or soil)

1

Work (people and equipment)

2

Cost resource

Element Properties for Exception:

The Type element has an integer value that represents the calendar exception type.

Value

Description

1

Daily

2

Yearly by day of the month

3

Yearly by position

4

Monthly by day of the month

5

Monthly by position

6

Weekly

7

By day count

8

By weekday count

9

No exception type

Element Properties for Value:

The Type element has an integer value that represents the type of outline code.

Value

Description

4

Date

6

Duration

9

Cost

15

Number

17

Flag

21

Text

27

Finish date

Element Properties for TimephasedData:

The Type element has an integer value that represents the type of timephased data.

Value

Description

1

Assignment Remaining Work

2

Assignment Actual Work

3

Assignment Actual Overtime Work

4

Assignment Baseline Work

5

Assignment Baseline Cost

6

Assignment Actual Cost

7

Resource Baseline Work

8

Resource Baseline Cost

9

Task Baseline Work

10

Task Baseline Cost

11

Task Percent Complete

16

Assignment Baseline 1 Work

17

Assignment Baseline 1 Cost

18

Task Baseline 1 Work

19

Task Baseline 1 Cost

20

Resource Baseline 1 Work

21

Resource Baseline 1 Cost

22

Assignment Baseline 2 Work

23

Assignment Baseline 2 Cost

24

Task Baseline 2 Work

25

Task Baseline 2 Cost

26

Resource Baseline 2 Work

27

Resource Baseline 2 Cost

28

Assignment Baseline 3 Work

29

Assignment Baseline 3 Cost

30

Task Baseline 3 Work

31

Task Baseline 3 Cost

32

Resource Baseline 3 Work

33

Resource Baseline 3 Cost

34

Assignment Baseline 4 Work

35

Assignment Baseline 4 Cost

36

Task Baseline 4 Work

37

Task Baseline 4 Cost

38

Resource Baseline 4 Work

39

Resource Baseline 4 Cost

40

Assignment Baseline 5 Work

41

Assignment Baseline 5 Cost

42

Task Baseline 5 Work

43

Task Baseline 5 Cost

44

Resource Baseline 5 Work

45

Resource Baseline 5 Cost

46

Assignment Baseline 6 Work

47

Assignment Baseline 6 Cost

48

Task Baseline 6 Work

49

Task Baseline 6 Cost

50

Resource Baseline 6 Work

51

Resource Baseline 6 Cost

52

Assignment Baseline 7 Work

53

Assignment Baseline 7 Cost

54

Task Baseline 7 Work

55

Task Baseline 7 Cost

56

Resource Baseline 7 Work

57

Resource Baseline 7 Cost

58

Assignment Baseline 8 Work

59

Assignment Baseline 8 Cost

60

Task Baseline 8 Work

61

Task Baseline 8 Cost

62

Resource Baseline 8 Work

63

Resource Baseline 8 Cost

64

Assignment Baseline 9 Work

65

Assignment Baseline 9 Cost

66

Task Baseline 9 Work

67

Task Baseline 9 Cost

68

Resource Baseline 9 Work

69

Resource Baseline 9 Cost

70

Assignment Baseline 10 Work

71

Assignment Baseline 10 Cost

72

Task Baseline 10 Work

73

Task Baseline 10 Cost

74

Resource Baseline 10 Work

75

Resource Baseline 10 Cost

76

Physical Percent Complete

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

OutlineCode Elements and XML Structure

XML Schema for the OutlineCodes Element

WBSMask Elements and XML Structure

XML Schema for the WBSMasks Element

Task Elements and XML Structure

XML Schema for the Tasks Element

Assignment Elements and XML Structure

XML Schema for the Resources Element

TimephasedDataType Elements and XML Structure

XML Schema for the TimephasedDataType Complex Type