PjDateFormat Enumeration

Project Developer Reference

Constant specifying the date format. The following table shows various formats applied to 9/30/02 (12:33 PM).

Requirements

Name Value Description
pjDate_dd 13 30
pjDate_ddd_dd 17 Tue 30
pjDate_ddd_hh_mmAM 11 Tue 12:33 PM
pjDate_ddd_mm_dd 16 Tue 9/30
pjDate_ddd_mm_dd_yy 9 Tue 9/30/02
pjDate_ddd_mm_dd_yy_hh_mmAM 8 Tue 9/30/02 12:33 PM
pjDate_ddd_mmm_dd 15 Tue Sep 30
pjDate_ddd_mmm_dd_yyy 10 Tue Sep 30, '02
pjDate_hh_mmAM 14 12:33 PM
pjDate_mm_dd 12 9/30
pjDate_mm_dd_yy 1 9/30/02
pjDate_mm_dd_yy_hh_mmAM 0 9/30/02 12:33 PM
pjDate_mm_dd_yyyy 20 9/30/2002
pjDate_mmm_dd 7 Sep 30
pjDate_mmm_dd_hh_mmAM 4 Sep 30 12:33 PM
pjDate_mmm_dd_yyy 5 Sep 30, '02
pjDate_mmmm_dd 6 September 30
pjDate_mmmm_dd_yyyy 3 September 30, 2002
pjDate_mmmm_dd_yyyy_hh_mmAM 2 September 30, 2002 12:33 PM
pjDate_Www_dd 18 W41/2
pjDate_Www_dd_yy_hh_mmAM 19 W41/2/02 12:33 PM
pjDateDefault 255 The default format, as specified on the View tab of the Options dialog box. (To open the Options dialog box, click Options on the Tools menu.)