IFPCReportJob::SetAsMultipleDaysReportJob method

Applies to: desktop apps only

The SetAsMultipleDaysReportJob method sets the report job to run on specific days of the week starting from a specified date.

Syntax

HRESULT SetAsMultipleDaysReportJob(
  [in]            FpcDaysOfWeek Days,
  [in]            FpcReportJobPeriodType PeriodType,
  [in, optional]  DATE StartDate
);
FPCReportJob.SetAsMultipleDaysReportJob( _
  ByVal Days As FpcDaysOfWeek, _
  ByVal PeriodType As FpcReportJobPeriodType, _
  [ ByVal StartDate As Date ] _
)

Parameters

  • Days [in]
    Bitmask of the FpcDaysOfWeek enumerated type that specifies the days of the week on which the report will run.

  • PeriodType [in]
    Value from the FpcReportJobPeriodType enumerated type that specifies the type of period (such as a day, a week, or a month) that each report will cover. The value fpcReportJobPeriodCustom, which is reserved for report jobs that run once, is not allowed.

  • StartDate [in, optional]
    Date value indicating the day on which the report will start being generated. The default value is the day on which the report job was created.

Return value

C++

This method returns S_OK if the call is successful; otherwise, it returns an error code.

VB

This method has no return values. If the call is unsuccessful, an error is raised that can be intercepted by using an error handler.

Requirements

Minimum supported client

Windows Vista

Minimum supported server

Windows Server 2008 R2, Windows Server 2008 with SP2 (64-bit only)

Version

Forefront Threat Management Gateway (TMG) 2010

IDL

Msfpccom.idl

DLL

Msfpccom.dll

See also

FPCReportJob

 

 

Build date: 7/12/2010