為了讓小組能以一致的方式持續提供高品質的軟體,看看兩個主要的實務。To maximize a team's ability to consistently deliver high quality software, Kanban emphasize two main practices. 首先,將工作流程視覺化,需要您對應小組的工作流程階段,並將您的儀表板面板設定為相符。The first, visualize the flow of work, requires you to map your team's workflow stages and configure your Kanban board to match. 第二個是限制進行中的工作量,您需要設定 (WIP) 限制的進行中工作。The second, constrain the amount of work in progress, requires you to set work-in-progress (WIP) limits. 然後您就可以在您的儀表板面板上追蹤進度,並監視關鍵計量來降低潛在客戶或週期時間。You're then ready to track progress on your Kanban board and monitor key metrics to reduce lead or cycle time.

儀表板面板Kanban board

您的儀表板面板會將待處理專案轉換為互動式 signboard,以提供視覺化的工作流程。Your Kanban board turns your backlog into an interactive signboard, providing a visual flow of work. 當工作從構想進展到完成時,您會更新面板上的專案。As work progresses from idea to completion, you update the items on the board. 每個資料行都代表一個工作階段,而每張卡片都代表一個使用者案例 (藍卡) 或在該工作階段) (紅卡的錯誤。Each column represents a work stage, and each card represents a user story (blue cards) or a bug (red cards) at that stage of work.

請參閱這篇文章,以瞭解如何設定和開始使用您的看板板:Review this article to gain an understanding of how to configure and start working with your Kanban boards:

  • 查看您的看板面板View your Kanban board
  • 自訂您的儀表板面板上顯示的資料行,以支援小組的運作方式Customize the columns shown on your Kanban board to support how your team works
  • 設定 WIP 限制以限制進行中的工作Set WIP limits to constrain work in progress
  • 透過拖放功能更新工作的狀態Update the status of work via drag-and-drop
  • 查看累計流動圖View the Cumulative flow chart
  • 如何開啟或關閉即時更新How to turn live updates on or off

注意

兩個看板面板和工作面板都支援將工作流程和監視計量視覺化,以優化該流程。Both Kanban boards and Taskboards support visualizing the flow of work and monitoring metrics to optimize that flow. 看板面板追蹤需求、與短期衝刺無關,並提供用於監視進度的累計流程圖。Kanban boards track requirements, are sprint-independent, and provide a cumulative flow chart for monitoring progress. 每個短期衝刺都會與支援針對短期衝刺定義之追蹤工作的工作面板相關聯。Each sprint is associated with a Taskboard that supports tracking tasks defined for the sprint. 您可以透過容量圖表和短期衝刺燃盡圖來監視進度。You can monitor progress through capacity charts and the sprint burndown chart. 如需使用工作面板的指引,請參閱 更新和監視您的工作面板For guidance on using the Taskboard, see Update and monitor your Taskboard.

使用者案例和 bug 會對應到工作專案的類型。User stories and bugs correspond to types of work items. 您可以使用 工作專案 來共用資訊、將工作指派給小組成員、更新狀態、追蹤相依性等等。You use work items to share information, assign work to team members, update status, track dependencies, and more.

必要條件Prerequisites

當您建立專案或新增小組時,會自動建立面板。Boards are automatically created when you create a project or add a team. 每個小組都可以存取自己的產品和組合面板,如「 關於小組和敏捷式工具」中所述。Each team has access to their own product and portfolio boards as described in About teams and Agile tools.

  • 您必須連接到專案。You must connect to a project. 如果您還沒有專案,請 建立一個專案。If you don't have a project yet, create one.
  • 您必須將專案加入至專案,做為 參與者project Administrators 安全性群組的成員。You must be added to a project as a member of the Contributors or Project Administrators security group. 若要加入,請 將使用者加入至專案或小組To get added, Add users to a project or team.
  • 若要加入工作專案並執行所有面板功能,您必須獲得 基本 存取權或更高的許可權。To add work items and exercise all board features, you must be granted Basic access or higher. 如需詳細資訊,請參閱 關於存取層級For details, see About access levels.
  • 若要查看或修改工作專案,您必須 在此節點中使用 view 工作專案 ,並將 此節點許可權中的 [工作專案 ] 設定為 [ 允許]。To view or modify work items, you must have your View work items in this node and Edit work items in this node permissions set to Allow. 依預設, Contributors 群組具有此許可權集合。By default, the Contributors group has this permission set. 若要深入瞭解,請參閱 設定工作追蹤的許可權和存取權To learn more, see Set permissions and access for work tracking.
  • 具有私用專案之專案關係 存取權的使用者,可以透過拖放方式加入工作專案和更新狀態,但無法更新卡片上顯示的欄位。Users with Stakeholder access for a private project can add work items and update status through drag-and-drop, but cannot update fields displayed on cards. 他們可以新增工作及變更工作狀態。They can add tasks and change task status.
  • 具有公用專案之專案關係 存取權的使用者,就像具有 基本 存取權的使用者一樣,擁有面板功能的完整存取權。Users with Stakeholder access for a public project have full access to board features just like users with Basic access. 如需詳細資訊,請參閱 關於存取層級For details, see About access levels.
  • 您必須連接到專案。You must connect to a project. 如果您還沒有專案,請 建立一個專案。If you don't have a project yet, create one.
  • 您必須將專案加入至專案,做為 參與者project Administrators 安全性群組的成員。You must be added to a project as a member of the Contributors or Project Administrators security group. 若要加入,請 將使用者加入至專案或小組To get added, Add users to a project or team.
  • 若要加入工作專案並執行所有面板功能,您必須獲得 基本 存取權或更高的許可權。To add work items and exercise all board features, you must be granted Basic access or higher. 如需詳細資訊,請參閱 關於存取層級For details, see About access levels.
  • 若要查看或修改工作專案,您必須 在此節點中使用 view 工作專案 ,並將 此節點許可權中的 [工作專案 ] 設定為 [ 允許]。To view or modify work items, you must have your View work items in this node and Edit work items in this node permissions set to Allow. 依預設, Contributors 群組具有此許可權集合。By default, the Contributors group has this permission set. 若要深入瞭解,請參閱 設定工作追蹤的許可權和存取權To learn more, see Set permissions and access for work tracking.
  • 具有專案關係 存取權的使用者無法執行這些面板功能:新增工作專案、拖放工作專案以更新狀態,或更新卡片上顯示的欄位。Users with Stakeholder access can't exercise these board features: add work items, drag-and-drop work items to update status, or update fields displayed on cards. 他們可以新增工作及變更工作狀態。They can add tasks and change task status.

注意

兩個看板面板和工作面板都支援將工作流程和監視計量視覺化,以優化該流程。Both Kanban boards and Taskboards support visualizing the flow of work and monitoring metrics to optimize that flow. 看板面板追蹤需求、與短期衝刺無關,並提供用於監視進度的累計流程圖。Kanban boards track requirements, are sprint-independent, and provide a cumulative flow chart for monitoring progress. 每個短期衝刺都會與支援針對短期衝刺定義之追蹤工作的工作面板相關聯。Each sprint is associated with a Taskboard that supports tracking tasks defined for the sprint. 您可以透過容量圖表和短期衝刺燃盡圖來監視進度。You can monitor progress through capacity charts and the sprint burndown chart. 如需使用工作面板的指引,請參閱 更新和監視您的工作面板For guidance on using the Taskboard, see Update and monitor your Taskboard.

從入口網站開啟您的儀表板面板Open your Kanban board from the web portal

您的儀表板面板是可供您使用的其中一種類型面板。Your Kanban board is one of two types of boards available to you. 另一個則是短期衝刺工作面板。The other is the sprint Taskboard. 看板面板追蹤需求、與短期衝刺無關,並提供用於監視進度的累計流程圖。Kanban boards track requirements, are sprint-independent, and provide a cumulative flow chart for monitoring progress. 每個短期衝刺都會與支援針對短期衝刺定義之追蹤工作的工作面板相關聯。Each sprint is associated with a Taskboard that supports tracking tasks defined for the sprint. 您可以透過容量圖表和短期衝刺燃盡圖來監視進度。You can monitor progress through capacity charts and the sprint burndown chart. 如需使用工作面板的指引,請參閱 更新和監視您的工作面板For guidance on using the Taskboard, see Update and monitor your Taskboard. 如需每個待處理專案和麵板上所支援功能的總覽,請參閱待處理專案 、面板和方案For an overview of the features supported on each backlog and board, see Backlogs, boards, and plans.

  1. 確認您選取的是正確的專案,然後 選取 [ 面板面板] > ****。Check that you selected the right project, and select Boards > Boards. 然後從 [小組選取器] 功能表中選取正確的小組。Then select the correct team from the team selector menu.

    開啟您的看板面板

    若要選取另一個小組的面板,請開啟選取器。To select another team's board, open the selector. 然後選取不同的小組,或選取  首頁圖示 [流覽所有 team 板] 選項。Then select a different team, or select the home icon Browse all team boards option. 或者,您可以在 [搜尋] 方塊中輸入關鍵字,以篩選項目的小組待處理專案清單。Or, you can enter a keyword in the search box to filter the list of team backlogs for the project.

    選取另一個小組的面板Select another team's board

    提示

    選取 星號圖示,讓小組面板成為我的最愛。 我的最愛構件 (我的最愛 圖示) 出現在 [team 選取器] 清單上方。

  2. 確認您選取了 Scrum 的 待處理專案 、Agile 案例 ,或 CMMI 的 需求 做為待處理專案層級。Check that you selected Backlog items for Scrum, Stories for Agile, or Requirements for CMMI as the backlog level.

    選取產品待處理專案層級、待處理專案、案例或需求Select product backlog level, Backlog items, Stories, or Requirements

若要切換至 產品待處理專案,請選取 [ 案例待 處理專案]。To switch to the product backlog, select Stories backlog. 若要切換到工作面板,請參閱 更新和監視您的工作面板To switch to a Taskboard, see Update and monitor your Taskboard.

  1. 確認您選取的是正確的專案,然後 選取 [ 面板面板] > ****。Check that you selected the right project, and select Boards > Boards. 然後從 [小組選取器] 功能表中選取正確的小組。Then select the correct team from the team selector menu.

    開啟您的看板面板

    若要選取另一個小組的面板,請開啟選取器。To select another team's board, open the selector. 然後選取不同的小組,或選取  首頁圖示 [流覽所有 team 板] 選項。Then select a different team, or select the home icon Browse all team boards option. 或者,您可以在 [搜尋] 方塊中輸入關鍵字,以篩選項目的小組待處理專案清單。Or, you can enter a keyword in the search box to filter the list of team backlogs for the project.

    選取另一個小組的面板Select another team's board

    提示

    選取 星號圖示,讓小組面板成為我的最愛。 我的最愛構件 (我的最愛 圖示) 出現在 [team 選取器] 清單上方。

  2. 確認您選取了 Scrum 的 待處理專案 、Agile 案例 ,或 CMMI 的 需求 做為待處理專案層級。Check that you selected Backlog items for Scrum, Stories for Agile, or Requirements for CMMI as the backlog level.

    選取產品待處理專案層級、待處理專案、案例或需求Select product backlog level, Backlog items, Stories, or Requirements

若要切換至 產品待處理專案,請選取 [ 案例待 處理專案]。To switch to the product backlog, select Stories backlog. 若要切換到工作面板,請參閱 更新和監視您的工作面板To switch to a Taskboard, see Update and monitor your Taskboard.

  1. 若要查看您的看板面板,請從網頁瀏覽器開啟您的專案。To view your Kanban board, open your project from a web browser. 選取 [工作待處理 專案] > > 案例,然後選取 [面板]。Select Work > Backlogs > Stories, and then select Board.

    開啟專案組合的儀表板、功能

    如果您沒有看到 [ 工作],您的螢幕大小可能會降低。If you don't see Work, your screen size might be reduced. 選取三個點 ( ) 圖示。 然後選取 [工作待處理 專案] > > 面板Then select Work > Backlogs > Board.

    當螢幕大小縮小時開啟工作

  2. 若要選取另一個小組,請開啟專案和小組選取器。To select another team, open the project and team selector. 選取不同的小組,或選取 [ 流覽] 選項。Select a different team, or select the Browse option.

    選取另一個小組Select another team

    您的儀表板面板隨即出現。Your Kanban board appears.

    看板,敏捷式軟體開發的範本

  1. 若要查看您的看板面板,請從網頁瀏覽器開啟您的專案。To view your Kanban board, open your project from a web browser. 選取 [工作待處理 專案] > > 案例,然後選取 [面板]。Select Work > Backlogs > Stories, and then select Board.

    開啟專案組合的儀表板、功能

    如果您沒有看到 [ 工作],您的螢幕大小可能會降低。If you don't see Work, your screen size might be reduced. 選取三個點 ( ) 圖示。 然後選取 [工作待處理 專案] > > 面板Then select Work > Backlogs > Board.

    當螢幕大小縮小時開啟工作

  2. 若要選取另一個小組,請開啟專案和小組選取器。To select another team, open the project and team selector. 選取不同的小組,或選取 [ 流覽] 選項。Select a different team, or select the Browse option.

    從 [專案] 功能表中選取其他小組

    您的儀表板面板隨即出現。Your Kanban board appears.

    TFS 2015、儀表板、Agile 範本TFS 2015, Kanban board, Agile template

1. 對應小組運作方式的流程1. Map the flow of how your team works

看看的是指 signboard 或佈告欄。 Kanban literally means signboard or billboard. 第一個步驟是自訂您的面板,以對應至小組的運作方式。As a first step, you customize your board to map to how your team works.

當您第一次開啟您的儀表板面板時,您會看到每個 工作流程狀態的一個資料行。When you first open your Kanban board, you'll see one column for each workflow state. 實際的資料行會 根據用來 建立專案的程式而有所不同。Your actual columns vary based on the process used to create your project.

在使用者案例中,新的、作用中、已解決和已關閉狀態會追蹤進度到完成的進度。For user stories, the New, Active, Resolved, and Closed states track progress from idea to completion.

User story workflow states Default kanban board, Agile template

不過,您小組的工作流程階段最可能不會對應至這些預設狀態。However, your team's workflow stages most likely don't map to these default states. 若要讓您的小組擁有功能面板,他們必須識別其工作流程流程的階段,然後設定符合的面板。For your team to have a functional board they must identify the stages of their workflow process and then configure the board to match.

例如,您可以變更您的看板資料行,以對應至下列五個工作流程階段。For example, you can change your Kanban columns to map to the following five workflow stages.

已自訂的儀表板面板

一旦您找到您的階段之後,只要新增和重新命名資料行 ,即可對應至這些階段。Once you've identified your stages, simply add and rename columns to map to them. 將資料行數目維持在最小值,但仍代表您的小組所發生的金鑰遞交。Keep the number of columns to a minimum while still representing the key handoffs that occur for your team.

2. 設定 WIP 限制以限制進行中的工作2. Set WIP limits to constrain work in progress

在下一個步驟中,您的小組會為每個工作流程階段設定 WIP 限制。 In this next step, your team sets WIP limits for each workflow stage. 設定 WIP 限制很簡單,但遵守這些限制會讓小組承諾用量。While setting WIP limits is easy, adhering to them takes a team commitment. 以查看者而言,新的團隊可能會發現 WIP 限制違反直覺和不舒服。Teams new to Kanban may find WIP limits counterintuitive and uncomfortable. 不過,這個單一實務已協助小組找出瓶頸、改善其程式,並提高其出貨的軟體品質。However, this single practice has helped teams identify bottlenecks, improve their process, and increase the quality of software they ship.

您應該設定哪些限制?What limits should you set? 開頭為每個小組成員在一個階段中工作不超過2或3個專案的數位。Start with numbers that don't exceed 2 or 3 items per team member working within a stage. 遵循 WIP 限制表示如果這樣做,小組不會將專案提取至資料行,而導致資料行中的專案數超過 WIP 限制。Respecting WIP limits means teams don't pull items into a column if doing so causes the number of items in the column to exceed the WIP limit.

當超過限制時,資料行計數會顯示紅色。When they do exceed the limit, the column count displays red. 小組可以將此作為通知,讓您立即專注于活動,以將資料行中的專案數目減少。Teams can use this as a signal to focus immediately on activities to bring the number of items in the column down.

超過 WIP 限制

當您的小組找出改善其流程的方法時,請根據小組討論和重新審視來設定 WIP 限制Set WIP limits based on team discussions and revisit as your team identifies ways to improve their processes. 使用 WIP 限制來找出瓶頸,並消除工作流程流程的浪費。Use WIP limits to identify bottlenecks and eliminate waste from your work flow processes.

3. 追蹤進行中的工作3. Track work in progress

一旦您'設定好您的儀表板面板以符合小組的運作方式,您'就可以開始使用它。 Once you've configured your Kanban board to match how your team works, you're ready to use it.

以下是您可以做的一些事。Here are a few things you can do. 查看每個專案的預估工作大小,這會顯示在每個卡片的右下方。See at a glance the estimated size of work for each item which displays at the bottom right of each card. 將專案加入至第一個資料行中的待處理專案。Add items to your backlog in the first column. 當優先權變更時,會在資料行中上下移動專案。When priorities change, move items up and down within a column. 此外,當工作在一個階段完成時,請將專案的狀態移至下游階段,以更新專案的狀態。And, as work completes in one stage, update the status of an item by moving it to a downstream stage.

Kanban board, move a card to update status

注意

您可以從 TFS 2015.1 和更新版本 中重新排列資料行內的專案You can reorder items within a column from TFS 2015.1 and later versions.

此外,您可以快速更新欄位,或直接從面板重新指派擁有權。Also, you can quickly update a field or reassign ownership directly from the board.

Kanban, assign items

隨著工作進展更新您的儀表板面板,可協助您和您的小組保持同步。此外,您還可以查看並共用您的小組傳遞給客戶的價值串流。Updating your Kanban board as work progresses helps keep you and your team in sync. Also, you'll be able to see and share the value stream your team is delivering to customers.

重要

出現在多個小組的看板上的工作專案,可能會產生不符合您預期的結果。Work items that appear on more than one team's Kanban board can yield results that don't meet your expectations. 每個小組都可以自訂儀表板面板資料行和泳道。Each team can customize the Kanban board columns and swimlanes. 因此,當另一個小組從不同的面板更新工作專案時,指派給 面板資料行面板泳道 的值可能會與您預期的不同。Therefore, the values assigned to Board Column or Board Swimlane may differ from what you expect when another team updates the work item from a different board.

解決此問題的主要工作是藉由 定義區域路徑並指派給小組,來維護工作專案的單一擁有權。The primary work around for this issue is to maintain single ownership of work items by Defining area paths and assign to a team. 另一個選項是新增所有小組都可以使用的自訂工作流程狀態。Another option is to add custom workflow states which all teams can use. 如需詳細資訊,請參閱 自訂工作流程 (繼承流程) For details, see Customize the workflow (Inheritance process).

重要

出現在多個小組的看板上的工作專案,可能會產生不符合您預期的結果。Work items that appear on more than one team's Kanban board can yield results that don't meet your expectations. 每個小組都可以自訂儀表板面板資料行和泳道。Each team can customize the Kanban board columns and swimlanes. 因此,當另一個小組從不同的面板更新工作專案時,指派給 面板資料行面板泳道 的值可能會與您預期的不同。Therefore, the values assigned to Board Column or Board Swimlane may differ from what you expect when another team updates the work item from a different board.

解決此問題的主要工作是藉由 定義區域路徑並指派給小組,來維護工作專案的單一擁有權。The primary work around for this issue is to maintain single ownership of work items by Defining area paths and assign to a team. 另一個選項是新增所有小組都可以使用的自訂工作流程狀態。Another option is to add custom workflow states which all teams can use. 如需詳細資訊,請參閱 變更工作專案類型的工作流程For details, see Change the workflow for a work item type.

4. 監視計量和微調4. Monitor metrics and fine tune

如同大部分的敏捷式作法,看起來會鼓勵監視關鍵計量來微調您的流程。As with most Agile practices, Kanban encourages monitoring key metrics to fine tune your processes. 在您的小組使用了數周的儀表板面板之後,請查看您的累計流程圖 (CFD) 。After your team has used the Kanban board for several weeks, check out your Cumulative Flow Diagram (CFD).

選擇 [ 分析 ] 索引標籤,然後針對累計流程圖選擇 [ View full report ],如下圖所示。Choose the Analytics tab, and then choose View full report for the Cumulative Flow Diagram as shown in the following image.

開啟分析Open Analytics

進行中的平均工作值排除已完成的工作專案。The Average work in progress value excludes completed work items.

使用互動式控制項來選擇時間範圍、泳道和工作流程狀態或儀表板面板資料行。Use the interactive controls to choose the time frame, swimlanes, and workflow states or Kanban board columns. 將滑鼠停留在某個時間點上,以顯示有多少個工作專案處於特定狀態。Hover over a point in time to show how many work items are in a particular state. 累積流程 Diagram-Average 進行中工作的預設設定包括已完成的工作專案,因為小組已開始追蹤工作。The default settings for the Cumulative Flow Diagram-Average work in progress includes completed work items since the team started tracking work.

例如,在101年7月3日,專案處於研究狀態。For example, On July 3, 101 items were in a Research state.

開啟 CFD 分析Open CFD Analytics

您所做的選擇只會為您設定,並且會跨會話保存,直到您變更它們為止。The selections you make are only set for you, and persist across sessions until you change them.

選擇圖表,如下圖所示。Choose the chart as shown in the following image.

Open the cumulative flow diagram

CFD 會顯示過去30周或更短時間內每個資料列的專案計數。The CFD shows the count of items in each Kanban column for the past 30 weeks or less. 在此圖表中,您可以瞭解進行中的工作量和前置時間。From this chart you can gain an idea of the amount of work in progress and lead time. 進行中的工作會計算未完成的需求。Work in progress counts unfinished requirements. 前置時程表示從第一次建議的時間完成需求所需的時間量。Lead time indicates the amount of time it takes to complete a requirement from the time it was first proposed.

Kanban board, cumulative flow diagram

藉由監視這些計量,您可以深入瞭解如何優化您的流程,並將前置時間降至最低。By monitoring these metrics, you can gain insight into how to optimize your processes and minimize lead time. 如需其他指引,請參閱 設定累計流程圖For additional guidance, see Configure a cumulative flow chart.

除了上述圖表之外,您還可以將分析 widget 新增至儀表板。In addition to the above chart, you can add Analytics widgets to your dashboard. 分析服務處於預覽狀態,可讓您存取數個小工具。The Analytics Service is in preview and provides access to several widgets. 若要深入瞭解,請參閱下列主題:To learn more, see these topics:

接下來嘗試這個Try this next

以下是使用「儀表板」面板時的一些實用秘訣:Here are some useful tips when working with the Kanban board:

  • 若要將焦點放在選取工作專案,請 篩選您的儀表板面板To focus on select work items, filter your Kanban board
  • 若要快速地將專案指派給小組成員,請新增 [指派給] 欄位以顯示在卡片上,請參閱 自訂卡片To quickly assign items to a team member, add the Assign To field to display on the cards, see Customize cards
  • 新增泳道來追蹤高優先順序的工作,或追蹤屬於不同服務等級協定的工作,請參閱 泳道Add a swimlane to track high-priority work or track work which falls into different service level agreements, see Swimlanes
  • 根據欄位值或標籤,以色彩編碼卡片反白顯示特定的工作專案, (查看 自訂卡片) Highlight specific work items by color coding cards based on a field value or tag, (see Customize cards)
  • 如果您使用 Scrumban,請將 [拖放] 卡片拖曳至短期衝刺,以快速將它們指派給短期衝刺。If you use Scrumban, drag-and-drop cards onto a sprint to quickly assign them to a sprint.

每個小組都可以管理其待處理專案,並自訂其儀表板面板。Each team can manage their backlog and customize their Kanban board. 當您將特定功能區域指派給不同的小組進行開發時,請新增小組Add teams when you assign specific feature areas to different teams for development. 然後,每個小組都可以管理其待處理專案,並專注于他們將如何開發其交付專案。Each team can then manage their backlog and focus on how they will develop their deliverables.

如果您不熟悉如何使用 Agile 工具來追蹤工作,並且想要瞭解可自訂的內容,請參閱 自訂您的工作追蹤體驗If you're new to tracking work with Agile tools and want to understand what you can customize, see Customize your work tracking experience.

啟用即時更新Enable live updates

啟用即時更新,以在發生變更時自動重新整理您的儀表板面板。Enable live updates to automatically refresh your Kanban board when changes occur. 啟用即時更新之後,您就不再需要按 F5 來查看最新的變更。With live updates enabled, you no longer have to press F5 to see the latest changes.

注意

TFS 2017 和更新版本支援即時更新。Live updates is supported on TFS 2017 and later versions.

選擇 [ 視圖選項] 圖示,並將 [ 即時更新 ] 的滑杆移至 [開啟]。

將 [即時更新] 的滑杆移至 [開啟]。Move the slider for Live updates to On.

選擇 [ 即時更新 ] 圖示。

[儀表板]、[即時更新] 圖示

當某個小組成員更新工作專案的狀態時,其他小組成員會在這些更新發生時即時看到這些更新。As one team member updates the status of a work item, other team members will see those updates in real time as they occur.

即時更新